IAC logo
IAC Assessment: OK0770
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0770
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2008
Principal Product Electric Motors and Drives
NAICS 335312 - Motor and Generator Manufacturing
SIC 3621 - Motors And Generators
Sales $10,000,000-$50,000,000
# of Employees 296
Plant Area (Sq.Ft.) 160,000
Annual Production 220,000 Units
Production Hrs. Annual 6,240
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $475,169 6,132,000 kWh $0.08
Natural Gas $71,845 6,514 MMBtu $11.03
TOTAL ENERGY COSTS $547,014
RECOMMENDED SAVINGS* $41,684 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,776
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,297
Cost:
-
$7,297 124,100 - - $7,297
124,100
kWh
-
-
MMBtu
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,597
Cost:
-
$2,597 39,713 - - $2,597
39,713
kWh
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$669
Cost:
$1,056
$669 10,234 - - $669
10,234
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,014
Cost:
$5,534
- - $8,014 619 -
-
kWh
$8,014
619
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,686
Cost:
$17,885
$4,686 56,010 - - $4,686
56,010
kWh
-
-
MMBtu
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$1,894
Cost:
$1,346
$1,894 28,968 - - $1,894
28,968
kWh
-
-
MMBtu
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$16,527
Cost:
-
$16,527 252,703 - - $16,527
252,703
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$41,684
Cost:
$25,821
$33,670 511,728 $8,014 619 $33,670
511,728
kWh
$8,014
619
MMBtu
TOTAL IMPLEMENTED Savings:
$31,776
Cost:
$18,941
$31,776 482,760 - - $31,776
482,760
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas