IAC logo
IAC Assessment: OK0771
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0771
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2008
Principal Product Flat annealed tempered glass
NAICS 327215 - Glass Product Manufacturing Made of Purchased Glass
SIC 3231 - Products Of Purchased Glass
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 150,000
Annual Production 12,000 Thousand Feet
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $598,202 9,664,699 kWh $0.06
Natural Gas $12,279 1,043 MMBtu $11.78
TOTAL ENERGY COSTS $610,481
RECOMMENDED SAVINGS* $28,465 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$12,463
Cost:
$846
$12,463 201,348 $12,463
201,348
kWh
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,125
Cost:
$3,460
$3,125 50,482 $3,125
50,482
kWh
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,458
Cost:
-
$3,458 55,861 $3,458
55,861
kWh
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,066
Cost:
-
$6,066 106,695 $6,066
106,695
kWh
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,001
Cost:
$2,875
$1,001 10,184 $1,001
10,184
kWh
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$284
Cost:
$1,213
$284 4,583 $284
4,583
kWh
07: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$2,068
Cost:
$200
$2,068 - $2,068
-
kWh
TOTAL RECOMMENDED Savings:
$28,465
Cost:
$8,594
$28,465 429,153 $28,465
429,153
kWh
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - -
-
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage