IAC logo
IAC Assessment: OK0774
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0774
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2009
Principal Product Furniture and Fabrication of wood and metal
NAICS 337127 - Institutional Furniture Manufacturing
SIC 2599 - Furniture And Fixtures, Nec
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 100,000
Annual Production 10,000 Pieces
Production Hrs. Annual 2,080
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,491 1,052,800 kWh $0.09
Natural Gas $8,622 744 MMBtu $11.59
TOTAL ENERGY COSTS $100,113
RECOMMENDED SAVINGS* $6,257 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,196
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$607
Cost:
$1,902
$607 6,982 $607
6,982
kWh
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,831
Cost:
-
$3,831 47,484 $3,831
47,484
kWh
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$365
Cost:
$1,154
$365 4,201 $365
4,201
kWh
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$229
Cost:
$1,891
$229 2,359 $229
2,359
kWh
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$825
Cost:
$5,760
$825 8,910 $825
8,910
kWh
06: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$400
Cost:
-
$400 - $400
-
kWh
TOTAL RECOMMENDED Savings:
$6,257
Cost:
$10,707
$6,257 69,936 $6,257
69,936
kWh
TOTAL IMPLEMENTED Savings:
$4,196
Cost:
$1,154
$4,196 51,685 $4,196
51,685
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage