IAC Assessment: OK0793
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0793
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2010
Principal Product Ice coolers, lanterns, stools
NAICS 339999 - All Other Miscellaneous Manufacturing
SIC 3999 - Manufacturing Industries, Nec
Sales $10,000,000-$50,000,000
# of Employees 1,000
Plant Area (Sq.Ft.) 1,300,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 7,904
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,782,700 48,043,200 kWh $0.06
Natural Gas $1,180,215 158,086 MMBtu $7.47
TOTAL ENERGY COSTS $3,962,915
RECOMMENDED SAVINGS* $764,581 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $137,711
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$88,705
Cost:
$104,400
- - $88,705 11,945 -
-
kWh
$88,705
11,945
MMBtu
02: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$150,096
Cost:
$1,969,500
- - $150,096 20,093 -
-
kWh
$150,096
20,093
MMBtu
03: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$1,246
Cost:
$33,150
- - $1,246 167 -
-
kWh
$1,246
167
MMBtu
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$217,752
Cost:
$100,000
$217,752 3,773,874 - - $217,752
3,773,874
kWh
-
-
MMBtu
05: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$104,850
Cost:
$134,480
$104,850 1,817,165 - - $104,850
1,817,165
kWh
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,717
Cost:
$17,813
$8,717 151,083 - - $8,717
151,083
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$33,411
Cost:
$69,755
$33,411 579,051 - - $33,411
579,051
kWh
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$26,971
Cost:
$111,113
$26,971 467,434 - - $26,971
467,434
kWh
-
-
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,136
Cost:
$21,130
$3,136 54,354 - - $3,136
54,354
kWh
-
-
MMBtu
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$67,527
Cost:
$42,259
$67,527 1,170,304 - - $67,527
1,170,304
kWh
-
-
MMBtu
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$21,881
Cost:
$4,522
$21,881 379,219 - - $21,881
379,219
kWh
-
-
MMBtu
12: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,071
Cost:
$995
$13,071 244,740 - - $13,071
244,740
kWh
-
-
MMBtu
13: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$27,218
Cost:
$30,300
$27,218 471,710 - - $27,218
471,710
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$764,581
Cost:
$2,639,417
$524,534 9,108,934 $240,047 32,205 $524,534
9,108,934
kWh
$240,047
32,205
MMBtu
TOTAL IMPLEMENTED Savings:
$137,711
Cost:
$153,508
$49,006 867,533 $88,705 11,945 $49,006
867,533
kWh
$88,705
11,945
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas