IAC logo
IAC Assessment: OK0797
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0797
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2010
Principal Product Wet Wipes
NAICS 322299 - All Other Converted Paper Product Manufacturing
SIC 2675 - Die-cut Paper And Board
Sales $50,000,000-$100,000,000
# of Employees 140
Plant Area (Sq.Ft.) 1,172,416
Annual Production 10,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $190,254 3,897,876 kWh $0.05
Natural Gas $110,474 16,100 MMBtu $6.86
TOTAL ENERGY COSTS $300,728
RECOMMENDED SAVINGS* $76,136 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $53,924
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$340
Cost:
$236
$340 6,973 - - $340
6,973
kWh
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,606
Cost:
$402
- - $1,606 234 -
-
kWh
$1,606
234
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,987
Cost:
$1,500
$1,987 40,708 - - $1,987
40,708
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$718
Cost:
$1,654
$718 14,717 - - $718
14,717
kWh
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$260
Cost:
-
$260 5,318 - - $260
5,318
kWh
-
-
MMBtu
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$583
Cost:
$2,539
$583 11,938 - - $583
11,938
kWh
-
-
MMBtu
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$14,118
Cost:
$5,326
- - $14,118 2,058 -
-
kWh
$14,118
2,058
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,991
Cost:
$3,994
- - $3,991 582 -
-
kWh
$3,991
582
MMBtu
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$856
Cost:
$5,934
$856 17,550 - - $856
17,550
kWh
-
-
MMBtu
10: 2.7495 INSTALL REPLACEMENT DOORS Savings:
$597
Cost:
$3,114
- - $597 87 -
-
kWh
$597
87
MMBtu
11: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$51,080
Cost:
$1,032,424
- - $51,080 7,446 -
-
kWh
$51,080
7,446
MMBtu
TOTAL RECOMMENDED Savings:
$76,136
Cost:
$1,057,123
$4,744 97,204 $71,392 10,407 $4,744
97,204
kWh
$71,392
10,407
MMBtu
TOTAL IMPLEMENTED Savings:
$53,924
Cost:
$1,037,038
$2,247 46,026 $51,677 7,533 $2,247
46,026
kWh
$51,677
7,533
MMBtu