IAC logo
IAC Assessment: OK0802
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0802
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2010
Principal Product Refurbished airplane parts
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 128,400
Annual Production 1,980 Pieces
Production Hrs. Annual 6,570
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $464,703 7,435,200 kWh $0.06
Natural Gas $24,600 2,817 MMBtu $8.73
TOTAL ENERGY COSTS $489,303
RECOMMENDED SAVINGS* $112,996 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $99,502
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$10,017
Cost:
$6,215
$10,017 44,928 - - $10,017
44,928
kWh
-
-
kW-months/year
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,400
Cost:
$1,550
$8,400 194,400 - - $8,400
194,400
kWh
-
-
kW-months/year
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$3,477
Cost:
$2,599
$3,477 62,422 - - $3,477
62,422
kWh
-
-
kW-months/year
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,998
Cost:
$13,149
$1,998 46,041 - - $1,998
46,041
kWh
-
-
kW-months/year
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$11,414
Cost:
$51,875
$11,414 263,000 - - $11,414
263,000
kWh
-
-
kW-months/year
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$10,918
Cost:
$2,775
$10,918 251,917 - - $10,918
251,917
kWh
-
-
kW-months/year
07: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$30,411
Cost:
$45,000
- - $30,411 4,512 -
-
kWh
$30,411
4,512
kW-months/year
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$23,800
Cost:
$15,600
$23,800 548,000 - - $23,800
548,000
kWh
-
-
kW-months/year
09: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$11,625
Cost:
-
$11,625 - - - $11,625
-
kWh
-
-
kW-months/year
10: 2.8112 COMBINE UTILITY METERS Savings:
$936
Cost:
$175
$936 7,457 - - $936
7,457
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$112,996
Cost:
$138,938
$82,585 1,418,165 $30,411 4,512 $82,585
1,418,165
kWh
$30,411
4,512
kW-months/year
TOTAL IMPLEMENTED Savings:
$99,502
Cost:
$130,124
$69,091 1,310,815 $30,411 4,512 $69,091
1,310,815
kWh
$30,411
4,512
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand