IAC logo
IAC Assessment: OK0806
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0806
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2011
Principal Product Plastic Gas Cans
NAICS 326160 - Plastics Bottle Manufacturing
SIC 3085 - Plastics Bottles
Sales $50,000,000-$100,000,000
# of Employees 280
Plant Area (Sq.Ft.) 600,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $615,863 21,091,222 kWh $0.03
Electricity Demand $401,468 40,308 kW-months/year $9.96
Natural Gas $771 44 MMBtu $17.53
TOTAL ENERGY COSTS $1,018,102
RECOMMENDED SAVINGS* $153,838 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,850
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Electricity Usage Personnel Changes
$ kWh $ $
01: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$109,231
Cost:
$57,500
$109,231 2,049,363 - - $109,231
2,049,363
kWh
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,484
Cost:
$37,707
$10,484 196,704 - - $10,484
196,704
kWh
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,177
Cost:
$38,005
$7,177 134,659 - - $7,177
134,659
kWh
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,415
Cost:
$7,724
$1,415 26,539 - - $1,415
26,539
kWh
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,172
Cost:
$1,600
$5,747 107,814 $(-575) - $5,747
107,814
kWh
$(-575)
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,602
Cost:
$414
$2,602 48,793 - - $2,602
48,793
kWh
-
-
$
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$8,222
Cost:
$870
$8,222 154,264 - - $8,222
154,264
kWh
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$6,859
Cost:
$2,964
$6,859 128,687 - - $6,859
128,687
kWh
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,676
Cost:
$7,130
$2,676 50,208 - - $2,676
50,208
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$153,838
Cost:
$153,914
$154,413 2,897,031 $(-575) - $154,413
2,897,031
kWh
$(-575)
-
$
TOTAL IMPLEMENTED Savings:
$26,850
Cost:
$85,450
$27,425 514,509 $(-575) - $27,425
514,509
kWh
$(-575)
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Personnel Changes Electricity Usage Personnel Changes