IAC logo
IAC Assessment: OK0807
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0807
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2011
Principal Product Municipal Castings
NAICS 331511 - Iron Foundries
SIC 3321 - Gray And Ductile Iron Foundries
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 210,000
Annual Production 60,000 Tons
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,006,472 66,336,000 kWh $0.03
Electricity Demand $987,154 242,544 kW-months/year $4.07
Natural Gas $467,237 82,927 MMBtu $5.63
TOTAL ENERGY COSTS $3,460,862
RECOMMENDED SAVINGS* $363,783 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,919
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$300,355
Cost:
$463,765
$189,838 4,209,258 $110,518 19,630 $189,838
4,209,258
kWh
$110,518
19,630
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,088
Cost:
$3,375
$2,088 46,299 - - $2,088
46,299
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,179
Cost:
$29,929
$8,179 181,359 - - $8,179
181,359
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,927
Cost:
$94,677
$12,927 286,640 - - $12,927
286,640
kWh
-
-
MMBtu
05: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$18,895
Cost:
-
$18,895 418,954 - - $18,895
418,954
kWh
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,936
Cost:
$4,200
$4,936 109,452 - - $4,936
109,452
kWh
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,980
Cost:
$3,757
$2,980 96,887 - - $2,980
96,887
kWh
-
-
MMBtu
08: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$6,163
Cost:
$12,100
$6,163 136,644 - - $6,163
136,644
kWh
-
-
MMBtu
09: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING Savings:
$7,260
Cost:
$14,928
- - $7,260 1,290 -
-
kWh
$7,260
1,290
MMBtu
TOTAL RECOMMENDED Savings:
$363,783
Cost:
$626,731
$246,006 5,485,493 $117,778 20,920 $246,006
5,485,493
kWh
$117,778
20,920
MMBtu
TOTAL IMPLEMENTED Savings:
$25,919
Cost:
$7,575
$25,919 574,705 - - $25,919
574,705
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas