IAC logo
IAC Assessment: OK0811
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0811
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2011
Principal Product Beef patties and pork sausage
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $100,000,000-$500,000,000
# of Employees 470
Plant Area (Sq.Ft.) 200,000
Annual Production 260,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,256,945 44,992,800 kWh $0.05
Natural Gas $818,414 168,106 MMBtu $4.87
TOTAL ENERGY COSTS $3,075,359
RECOMMENDED SAVINGS* $446,411 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,696
#|Description Savings
Cost
Status Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption
$ kWh $ MMBtu $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$127,513
Cost:
$58,126
$127,513 2,550,268 - - - - $127,513
2,550,268
kWh
-
-
MMBtu
-
-
Tgal
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$17,432
Cost:
$60,934
$17,432 348,648 - - - - $17,432
348,648
kWh
-
-
MMBtu
-
-
Tgal
03: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$2,854
Cost:
$2,600
$2,854 57,075 - - - - $2,854
57,075
kWh
-
-
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,132
Cost:
$60,156
$13,132 262,642 - - - - $13,132
262,642
kWh
-
-
MMBtu
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,716
Cost:
$11,429
$8,716 174,315 - - - - $8,716
174,315
kWh
-
-
MMBtu
-
-
Tgal
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$160
Cost:
$944
$160 3,192 - - - - $160
3,192
kWh
-
-
MMBtu
-
-
Tgal
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$32,372
Cost:
$270,346
- - $32,372 6,446 - - -
-
kWh
$32,372
6,446
MMBtu
-
-
Tgal
08: 3.4151 MINIMIZE WATER USAGE Savings:
$159,930
Cost:
$46,397
- - - - $159,930 - -
-
kWh
-
-
MMBtu
$159,930
-
Tgal
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$61,620
Cost:
$459
- - $61,620 12,653 - - -
-
kWh
$61,620
12,653
MMBtu
-
-
Tgal
10: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$22,682
Cost:
-
- - $22,682 4,658 - - -
-
kWh
$22,682
4,658
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$446,411
Cost:
$511,391
$169,807 3,396,140 $116,674 23,757 $159,930 - $169,807
3,396,140
kWh
$116,674
23,757
MMBtu
$159,930
-
Tgal
TOTAL IMPLEMENTED Savings:
$25,696
Cost:
$3,544
$3,014 60,267 $22,682 4,658 - - $3,014
60,267
kWh
$22,682
4,658
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ Tgal
Electricity Usage Natural Gas Water Consumption Electricity Usage Natural Gas Water Consumption