Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2011 |
Principal Product | Beef patties and pork sausage |
NAICS | 311612 - Meat Processed from Carcasses |
SIC | 2013 - Sausages And Other Prepared Meats |
Sales | $100,000,000-$500,000,000 |
# of Employees | 470 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 260,000,000 Pounds |
Production Hrs. Annual | 8,760 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,256,945 | 44,992,800 | kWh | $0.05 |
Natural Gas | $818,414 | 168,106 | MMBtu | $4.87 |
TOTAL ENERGY COSTS | $3,075,359 | |||
RECOMMENDED SAVINGS* | $446,411 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $25,696 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Water Consumption | Electricity Usage | Natural Gas | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $127,513 Cost: $58,126 |
$127,513 | 2,550,268 | - | - | - | - |
$127,513 2,550,268 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $17,432 Cost: $60,934 |
$17,432 | 348,648 | - | - | - | - |
$17,432 348,648 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS |
Savings: $2,854 Cost: $2,600 |
$2,854 | 57,075 | - | - | - | - |
$2,854 57,075 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,132 Cost: $60,156 |
$13,132 | 262,642 | - | - | - | - |
$13,132 262,642 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,716 Cost: $11,429 |
$8,716 | 174,315 | - | - | - | - |
$8,716 174,315 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $160 Cost: $944 |
$160 | 3,192 | - | - | - | - |
$160 3,192 kWh |
- - MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $32,372 Cost: $270,346 |
- | - | $32,372 | 6,446 | - | - |
- - kWh |
$32,372 6,446 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.4151 MINIMIZE WATER USAGE |
Savings: $159,930 Cost: $46,397 |
- | - | - | - | $159,930 | - |
- - kWh |
- - MMBtu |
$159,930 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $61,620 Cost: $459 |
- | - | $61,620 | 12,653 | - | - |
- - kWh |
$61,620 12,653 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED |
Savings: $22,682 Cost: - |
- | - | $22,682 | 4,658 | - | - |
- - kWh |
$22,682 4,658 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $446,411 Cost: $511,391 |
$169,807 | 3,396,140 | $116,674 | 23,757 | $159,930 | - | $169,807 3,396,140 kWh |
$116,674 23,757 MMBtu |
$159,930 - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $25,696 Cost: $3,544 |
$3,014 | 60,267 | $22,682 | 4,658 | - | - | $3,014 60,267 kWh |
$22,682 4,658 MMBtu |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Water Consumption | Electricity Usage | Natural Gas | Water Consumption |