Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2012 |
Principal Product | Ferrous Castings |
NAICS | 331513 - Steel Foundries (except Investment) |
SIC | 3325 - Steel Foundries, Nec |
Sales | $1,000,000-$5,000,000 |
# of Employees | 35 |
Plant Area (Sq.Ft.) | 35,470 |
Annual Production | 1,900 Tons |
Production Hrs. Annual | 2,340 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $239,951 | 2,490,900 | kWh | $0.10 |
Natural Gas | $12,622 | 1,631 | MMBtu | $7.74 |
TOTAL ENERGY COSTS | $252,573 | |||
RECOMMENDED SAVINGS* | $338,764 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $314,679 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $19,728 Cost: $10,884 |
$19,728 | 204,861 | - | - | - | - |
$19,728 204,861 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,891 Cost: $16,296 |
$1,891 | 19,635 | - | - | - | - |
$1,891 19,635 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $199 Cost: $556 |
$199 | 2,067 | - | - | - | - |
$199 2,067 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,633 Cost: $560 |
$2,633 | 27,346 | - | - | - | - |
$2,633 27,346 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $15,206 Cost: $29,250 |
$15,206 | 157,906 | - | - | - | - |
$15,206 157,906 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,466 Cost: - |
$2,466 | 25,603 | - | - | - | - |
$2,466 25,603 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $102 Cost: $353 |
- | - | $102 | 13 | - | - |
- - kWh |
$102 13 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $296,539 Cost: $350,000 |
$12,619 | 131,040 | - | - | $283,920 | - |
$12,619 131,040 kWh |
- - MMBtu |
$283,920 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $338,764 Cost: $407,899 |
$54,742 | 568,458 | $102 | 13 | $283,920 | - | $54,742 568,458 kWh |
$102 13 MMBtu |
$283,920 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $314,679 Cost: $380,719 |
$30,657 | 318,359 | $102 | 13 | $283,920 | - | $30,657 318,359 kWh |
$102 13 MMBtu |
$283,920 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Natural Gas | One-time Revenue or Avoided Cost |