IAC logo
IAC Assessment: OK0819
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0819
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2012
Principal Product Ferrous Castings
NAICS 331513 - Steel Foundries (except Investment)
SIC 3325 - Steel Foundries, Nec
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 35,470
Annual Production 1,900 Tons
Production Hrs. Annual 2,340
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,951 2,490,900 kWh $0.10
Natural Gas $12,622 1,631 MMBtu $7.74
TOTAL ENERGY COSTS $252,573
RECOMMENDED SAVINGS* $338,764 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $314,679
#|Description Savings
Cost
Status Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,728
Cost:
$10,884
$19,728 204,861 - - - - $19,728
204,861
kWh
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,891
Cost:
$16,296
$1,891 19,635 - - - - $1,891
19,635
kWh
-
-
MMBtu
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$199
Cost:
$556
$199 2,067 - - - - $199
2,067
kWh
-
-
MMBtu
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,633
Cost:
$560
$2,633 27,346 - - - - $2,633
27,346
kWh
-
-
MMBtu
-
-
$
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$15,206
Cost:
$29,250
$15,206 157,906 - - - - $15,206
157,906
kWh
-
-
MMBtu
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,466
Cost:
-
$2,466 25,603 - - - - $2,466
25,603
kWh
-
-
MMBtu
-
-
$
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$102
Cost:
$353
- - $102 13 - - -
-
kWh
$102
13
MMBtu
-
-
$
08: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$296,539
Cost:
$350,000
$12,619 131,040 - - $283,920 - $12,619
131,040
kWh
-
-
MMBtu
$283,920
-
$
TOTAL RECOMMENDED Savings:
$338,764
Cost:
$407,899
$54,742 568,458 $102 13 $283,920 - $54,742
568,458
kWh
$102
13
MMBtu
$283,920
-
$
TOTAL IMPLEMENTED Savings:
$314,679
Cost:
$380,719
$30,657 318,359 $102 13 $283,920 - $30,657
318,359
kWh
$102
13
MMBtu
$283,920
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost