IAC Assessment: OK0821
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0821
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2012
Principal Product Shopping Carts
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 502,000
Annual Production 482,000 Pieces
Production Hrs. Annual 4,160
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $618,924 8,741,280 kWh $0.07
Electricity Demand $304,507 21,907 kW-months/year $13.90
Natural Gas $216,958 45,598 MMBtu $4.76
TOTAL ENERGY COSTS $1,140,389
RECOMMENDED SAVINGS* $131,751 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,838
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$43,921
Cost:
$24,480
$43,921 620,362 - - - - $43,921
620,362
kWh
-
-
$
-
-
MMBtu
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$3,466
Cost:
$2,840
$3,466 48,960 - - - - $3,466
48,960
kWh
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,363
Cost:
$2,514
$2,363 33,385 - - - - $2,363
33,385
kWh
-
-
$
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,847
Cost:
$15,486
$4,847 68,469 - - - - $4,847
68,469
kWh
-
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,712
Cost:
$15,478
$2,712 38,316 - - - - $2,712
38,316
kWh
-
-
$
-
-
MMBtu
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$17,137
Cost:
-
$17,137 242,062 - - - - $17,137
242,062
kWh
-
-
$
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,375
Cost:
$1,700
$8,375 118,292 - - - - $8,375
118,292
kWh
-
-
$
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,301
Cost:
-
$5,301 74,880 - - - - $5,301
74,880
kWh
-
-
$
-
-
MMBtu
09: 2.1224 REPLACE BOILER Savings:
$21,929
Cost:
$26,400
- - - - $21,929 4,607 -
-
kWh
-
-
$
$21,929
4,607
MMBtu
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,699
Cost:
$3,135
- - - - $2,699 567 -
-
kWh
-
-
$
$2,699
567
MMBtu
11: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,001
Cost:
$9,750
- - $19,001 - - - -
-
kWh
$19,001
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$131,751
Cost:
$101,783
$88,122 1,244,726 $19,001 - $24,628 5,174 $88,122
1,244,726
kWh
$19,001
-
$
$24,628
5,174
MMBtu
TOTAL IMPLEMENTED Savings:
$41,838
Cost:
$35,504
$41,838 590,979 - - - - $41,838
590,979
kWh
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas