IAC logo
IAC Assessment: OK0824
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0824
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2012
Principal Product Shape wear
NAICS 315210 - Cut and Sew Apparel Contractors
SIC 2341 - Women's, Misses', Children's, and Infants' Underwear and Nightwear
Sales $50,000,000-$100,000,000
# of Employees 147
Plant Area (Sq.Ft.) 130,000
Annual Production 715,000 Pieces
Production Hrs. Annual 2,730
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,376 1,191,600 kWh $0.10
Natural Gas $43,042 5,268 MMBtu $8.17
TOTAL ENERGY COSTS $159,418
RECOMMENDED SAVINGS* $61,667 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,291
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$17,721
Cost:
$31,152
$9,110 93,922 $8,611 1,054 $9,110
93,922
kWh
$8,611
1,054
MMBtu
02: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$21,096
Cost:
$22,080
$21,096 217,486 - - $21,096
217,486
kWh
-
-
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$9,127
Cost:
$23,400
$1,693 17,454 $7,434 910 $1,693
17,454
kWh
$7,434
910
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,183
Cost:
$8,237
$2,183 22,512 - - $2,183
22,512
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,772
Cost:
$8,055
$2,772 28,578 - - $2,772
28,578
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$787
Cost:
$4,095
$787 8,117 - - $787
8,117
kWh
-
-
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$687
Cost:
$1,691
$687 7,092 - - $687
7,092
kWh
-
-
MMBtu
08: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$6,045
Cost:
$162,500
$679 7,005 $5,366 656 $679
7,005
kWh
$5,366
656
MMBtu
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,249
Cost:
$461
- - $1,249 153 -
-
kWh
$1,249
153
MMBtu
TOTAL RECOMMENDED Savings:
$61,667
Cost:
$261,671
$39,007 402,166 $22,660 2,773 $39,007
402,166
kWh
$22,660
2,773
MMBtu
TOTAL IMPLEMENTED Savings:
$10,291
Cost:
$176,341
$4,925 50,792 $5,366 656 $4,925
50,792
kWh
$5,366
656
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas