IAC Assessment: OK0826
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0826
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2012
Principal Product Aircraft fuel cells
NAICS 335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing
SIC 3629 - Electrical Industrial Apparatus, Nec
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 450,000
Annual Production 3,300 Pieces
Production Hrs. Annual 3,300
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $424,014 5,289,966 kWh $0.08
Electricity Demand $109,852 18,746 kW-months/year $5.86
Natural Gas $387,222 63,559 MMBtu $6.09
TOTAL ENERGY COSTS $921,088
RECOMMENDED SAVINGS* $133,486 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,497
Cost:
$27,016
- - - - $17,497 2,873 - - - - -
-
kWh
-
-
kW-months/year
$17,497
2,873
MMBtu
-
-
Tgal
-
-
gal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$50,910
Cost:
$106,879
$40,218 501,784 $10,692 1,825 - - - - - - $40,218
501,784
kWh
$10,692
1,825
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,061
Cost:
$38,900
$19,797 247,000 $5,263 898 - - - - - - $19,797
247,000
kWh
$5,263
898
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
04: 2.2514 COVER OPEN TANKS Savings:
$1,576
Cost:
-
- - - - $1,576 220 - - - - -
-
kWh
-
-
kW-months/year
$1,576
220
MMBtu
-
-
Tgal
-
-
gal
05: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$13,280
Cost:
$31,040
- - - - $6,820 1,120 $2,280 380,000 $4,180 380,000 -
-
kWh
-
-
kW-months/year
$6,820
1,120
MMBtu
$2,280
380,000
Tgal
$4,180
380,000
gal
06: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$4,630
Cost:
$4,000
- - - - $4,630 760 - - - - -
-
kWh
-
-
kW-months/year
$4,630
760
MMBtu
-
-
Tgal
-
-
gal
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$20,532
Cost:
$9,400
- - - - $20,532 3,371 - - - - -
-
kWh
-
-
kW-months/year
$20,532
3,371
MMBtu
-
-
Tgal
-
-
gal
TOTAL RECOMMENDED Savings:
$133,486
Cost:
$217,235
$60,015 748,784 $15,956 2,723 $51,055 8,344 $2,280 380,000 $4,180 380,000 $60,015
748,784
kWh
$15,956
2,723
kW-months/year
$51,055
8,344
MMBtu
$2,280
380,000
Tgal
$4,180
380,000
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ gal
Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Other Liquid (non-haz)