IAC logo
IAC Assessment: OK0829
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0829
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2012
Principal Product Trailers
NAICS 336212 - Truck Trailer Manufacturing
SIC 3715 - Truck Trailers
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 525,000
Annual Production 1,500 Pieces
Production Hrs. Annual 2,600
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $188,869 3,878,856 kWh $0.05
Electricity Demand $24,810 15,506 kW-months/year $1.60
LPG $275,364 12,074 MMBtu $22.81
Fuel Oil #1 $13,713 592 MMBtu $23.16
TOTAL ENERGY COSTS $502,756
RECOMMENDED SAVINGS* $60,522 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,180
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #1 Electricity Usage Electricity Demand LPG Fuel Oil #1
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,021
Cost:
$1,600
$11,021 220,430 - - - - - - $11,021
220,430
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,959
Cost:
$33,990
$4,706 94,127 $253 158 - - - - $4,706
94,127
kWh
$253
158
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,968
Cost:
$260,400
$16,626 332,514 $2,342 1,464 - - - - $16,626
332,514
kWh
$2,342
1,464
kW-months/year
-
-
MMBtu
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$346
Cost:
$954
$346 6,923 - - - - - - $346
6,923
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$202
Cost:
$1,139
$186 3,717 $16 10 - - - - $186
3,717
kWh
$16
10
kW-months/year
-
-
MMBtu
-
-
MMBtu
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$5,221
Cost:
$7,540
$5,221 104,417 - - - - - - $5,221
104,417
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
07: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$2,159
Cost:
$417
$2,059 41,172 $100 63 - - - - $2,059
41,172
kWh
$100
63
kW-months/year
-
-
MMBtu
-
-
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,516
Cost:
$489
$3,516 70,324 - - - - - - $3,516
70,324
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$5,966
Cost:
$80,748
$5,690 113,773 $276 172 - - - - $5,690
113,773
kWh
$276
172
kW-months/year
-
-
MMBtu
-
-
MMBtu
10: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$8,164
Cost:
$17,500
- - - - $(-4,574) (-201) $12,738 550 -
-
kWh
-
-
kW-months/year
$(-4,574)
(-201)
MMBtu
$12,738
550
MMBtu
TOTAL RECOMMENDED Savings:
$60,522
Cost:
$404,777
$49,371 987,397 $2,987 1,867 $(-4,574) (-201) $12,738 550 $49,371
987,397
kWh
$2,987
1,867
kW-months/year
$(-4,574)
(-201)
MMBtu
$12,738
550
MMBtu
TOTAL IMPLEMENTED Savings:
$13,180
Cost:
$2,017
$13,080 261,602 $100 63 - - - - $13,080
261,602
kWh
$100
63
kW-months/year
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand LPG Fuel Oil #1 Electricity Usage Electricity Demand LPG Fuel Oil #1