IAC logo
IAC Assessment: OK0832
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0832
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2012
Principal Product Aircraft engine parts
NAICS 336412 - Aircraft Engine and Engine Parts Manufacturing
SIC 3724 - Aircraft Engines And Engine Parts
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 42,163
Annual Production 380,000 Pieces
Production Hrs. Annual 4,368
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $157,351 2,158,718 kWh $0.07
Natural Gas $4,232 367 MMBtu $11.53
TOTAL ENERGY COSTS $161,583
RECOMMENDED SAVINGS* $45,429 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,579
#|Description Savings
Cost
Status Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,902
Cost:
$7,700
$2,902 39,754 - - - - $2,902
39,754
kWh
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$955
Cost:
$1,288
$955 13,078 - - - - $955
13,078
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$995
Cost:
$6,375
$995 13,632 - - - - $995
13,632
kWh
-
-
MMBtu
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$655
Cost:
$4,180
$655 8,970 - - - - $655
8,970
kWh
-
-
MMBtu
-
-
$
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$18,428
Cost:
$7,200
$18,428 252,432 - - - - $18,428
252,432
kWh
-
-
MMBtu
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$7,382
Cost:
$34,962
$7,382 101,123 - - - - $7,382
101,123
kWh
-
-
MMBtu
-
-
$
07: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$6,074
Cost:
$29,738
$6,074 83,211 - - - - $6,074
83,211
kWh
-
-
MMBtu
-
-
$
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,158
Cost:
$185
$1,926 26,382 $232 38 - - $1,926
26,382
kWh
$232
38
MMBtu
-
-
$
09: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$2,579
Cost:
$1,170
$2,579 35,323 - - - - $2,579
35,323
kWh
-
-
MMBtu
-
-
$
10: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,669
Cost:
$696
$1,669 22,861 - - - - $1,669
22,861
kWh
-
-
MMBtu
-
-
$
11: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,632
Cost:
$8,864
- - - - $1,632 - -
-
kWh
-
-
MMBtu
$1,632
-
$
TOTAL RECOMMENDED Savings:
$45,429
Cost:
$102,358
$43,565 596,766 $232 38 $1,632 - $43,565
596,766
kWh
$232
38
MMBtu
$1,632
-
$
TOTAL IMPLEMENTED Savings:
$2,579
Cost:
$1,170
$2,579 35,323 - - - - $2,579
35,323
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost