IAC logo
IAC Assessment: OK0875
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0875
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2014
Principal Product frozen dessert mixes
NAICS 311520 - Ice Cream and Frozen Dessert Manufacturing
SIC 2024 - Ice Cream And Frozen Desserts
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 50,000
Annual Production 6,500 Thousand Gallons
Production Hrs. Annual 2,900
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $155,996 2,426,960 kWh $0.06
Electricity Demand $49,076 11,319 kW-months/year $4.34
Natural Gas $96,305 12,007 MMBtu $8.02
TOTAL ENERGY COSTS $435,646
RECOMMENDED SAVINGS* $50,631 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,445
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$8,228
Cost:
-
- - - - $8,228 - - - - - -
-
kWh
-
-
kW-months/year
$8,228
-
$
-
-
MMBtu
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$755
Cost:
$2,833
$590 9,185 $165 38 - - - - - - $590
9,185
kWh
$165
38
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,198
Cost:
$3,567
$1,855 28,846 $343 79 - - - - - - $1,855
28,846
kWh
$343
79
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,005
Cost:
$945
$2,849 44,301 $156 36 - - - - - - $2,849
44,301
kWh
$156
36
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$13,420
Cost:
$2,400
$5,913 62,370 - - - - $7,507 936 - - $5,913
62,370
kWh
-
-
kW-months/year
-
-
$
$7,507
936
MMBtu
-
-
Tgal
06: 3.4151 MINIMIZE WATER USAGE Savings:
$19,960
Cost:
$800
- - - - - - - - $19,960 5,040 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$19,960
5,040
Tgal
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$3,065
Cost:
$15
- - - - $3,065 - - - - - -
-
kWh
-
-
kW-months/year
$3,065
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$50,631
Cost:
$10,560
$11,207 144,702 $664 153 $11,293 - $7,507 936 $19,960 5,040 $11,207
144,702
kWh
$664
153
kW-months/year
$11,293
-
$
$7,507
936
MMBtu
$19,960
5,040
Tgal
TOTAL IMPLEMENTED Savings:
$36,445
Cost:
$3,215
$5,913 62,370 - - $3,065 - $7,507 936 $19,960 5,040 $5,913
62,370
kWh
-
-
kW-months/year
$3,065
-
$
$7,507
936
MMBtu
$19,960
5,040
Tgal
Savings