Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2014
Principal Product Parking Meters
NAICS 334514 - Totalizing Fluid Meter and Counting Device Manufacturing
SIC 3824 - Fluid Meters And Counting Devices
Sales $1,000,000-$5,000,000
# of Employees 50
Plant Area (Sq.Ft.) 57,000
Annual Production 10,000 Pieces
Production Hrs. Annual 4,125
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $69,870 838,400 kWh $0.08
Electricity Demand $15,631 4,895 kW-months/year $3.19
Natural Gas $77,383 10,037 MMBtu $7.71
TOTAL ENERGY COSTS $162,884
RECOMMENDED SAVINGS* $58,348 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,084
Cost:
$3,640
$8,197 98,400 $887 278 - - - - - - $8,197
98,400
kWh
$887
278
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$681
Cost:
$1,600
$566 6,800 $115 36 - - - - - - $566
6,800
kWh
$115
36
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,306
Cost:
$530
$1,216 14,600 $89 28 - - - - - - $1,216
14,600
kWh
$89
28
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$870
Cost:
$830
$870 10,430 - - - - - - - - $870
10,430
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$168
Cost:
$15
- - - - $168 - - - - - -
-
kWh
-
-
kW-months/year
$168
-
$
-
-
MMBtu
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,040
Cost:
$645
$3,040 36,500 - - - - - - - - $3,040
36,500
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,400
Cost:
$30
- - - - - - - - $1,400 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,400
-
$
08: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$41,800
Cost:
$54,000
- - - - - - $41,800 5,374 - - -
-
kWh
-
-
kW-months/year
-
-
$
$41,800
5,374
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$58,348
Cost:
$61,290
$13,889 166,730 $1,091 342 $168 - $41,800 5,374 $1,400 - $13,889
166,730
kWh
$1,091
342
kW-months/year
$168
-
$
$41,800
5,374
MMBtu
$1,400
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Demand Electricity Fees Natural Gas Primary Product