IAC Assessment: OK0877
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0877
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2014
Principal Product Investment castings
NAICS 331523 - Nonferrous Metal Die-Casting Foundries
SIC 3324 - Steel Investment Foundries
Sales $5,000,000-$10,000,000
# of Employees 54
Plant Area (Sq.Ft.) 20,000
Annual Production 28,600 Pieces
Production Hrs. Annual 5,850
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,308 1,546,500 kWh $0.12
Natural Gas $30,563 6,728 MMBtu $4.54
TOTAL ENERGY COSTS $215,871
RECOMMENDED SAVINGS* $62,962 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $26,107
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$23,245
Cost:
-
$23,245 193,708 - - $23,245
193,708
kWh
-
-
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,223
Cost:
$1,540
$2,223 18,528 - - $2,223
18,528
kWh
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,460
Cost:
$2,969
$11,460 95,500 - - $11,460
95,500
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$652
Cost:
$3,540
$652 5,437 - - $652
5,437
kWh
-
-
MMBtu
05: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$8,810
Cost:
$4,000
$8,810 73,416 - - $8,810
73,416
kWh
-
-
MMBtu
06: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$52
Cost:
$30
$52 430 - - $52
430
kWh
-
-
MMBtu
07: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$700
Cost:
$120
- - $700 154 -
-
kWh
$700
154
MMBtu
08: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$487
Cost:
$1,834
$487 4,057 - - $487
4,057
kWh
-
-
MMBtu
09: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$2,159
Cost:
$1,600
- - $2,159 475 -
-
kWh
$2,159
475
MMBtu
10: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$6,815
Cost:
$55,000
- - $6,815 1,502 -
-
kWh
$6,815
1,502
MMBtu
11: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,984
Cost:
$17,104
- - $3,984 877 -
-
kWh
$3,984
877
MMBtu
12: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,375
Cost:
$5,900
- - $2,375 523 -
-
kWh
$2,375
523
MMBtu
TOTAL RECOMMENDED Savings:
$62,962
Cost:
$93,637
$46,929 391,077 $16,033 3,531 $46,929
391,077
kWh
$16,033
3,531
MMBtu
TOTAL IMPLEMENTED Savings:
$26,107
Cost:
$5,170
$23,949 199,575 $2,159 475 $23,949
199,575
kWh
$2,159
475
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas