IAC logo
IAC Assessment: OK0889
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0889
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2014
Principal Product Aircraft composites manufacturing
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 140,000
Annual Production 765 Pieces
Production Hrs. Annual 4,420
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $225,737 3,965,593 kWh $0.06
Electricity Demand $116,777 10,540 kW-months/year $11.08
Natural Gas $92,552 16,794 MMBtu $5.51
TOTAL ENERGY COSTS $435,066
RECOMMENDED SAVINGS* $47,583 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,233
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$15,746
Cost:
$14,500
$15,746 276,250 - - - - - - $15,746
276,250
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.2691 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS Savings:
$4,415
Cost:
$7,547
$1,877 32,931 $2,538 228 - - - - $1,877
32,931
kWh
$2,538
228
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$10,189
Cost:
$4,650
$6,139 107,708 - - - - $4,050 735 $6,139
107,708
kWh
-
-
kW-months/year
-
-
$
$4,050
735
MMBtu
04: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$4,444
Cost:
$6,994
$1,913 33,565 $2,531 228 - - - - $1,913
33,565
kWh
$2,531
228
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,519
Cost:
$5,372
$994 17,432 $526 47 - - - - $994
17,432
kWh
$526
47
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$200
Cost:
$696
$200 3,513 - - - - - - $200
3,513
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,946
Cost:
$320
$1,946 34,137 - - - - - - $1,946
34,137
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
08: 2.1121 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING Savings:
$815
Cost:
$250
- - - - - - $815 148 -
-
kWh
-
-
kW-months/year
-
-
$
$815
148
MMBtu
09: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,124
Cost:
$239
$1,124 19,721 - - - - - - $1,124
19,721
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
10: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$2,920
Cost:
$10,599
$2,920 51,224 - - - - - - $2,920
51,224
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
11: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,264
Cost:
$2,925
- - - - $4,264 - - - -
-
kWh
-
-
kW-months/year
$4,264
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$47,583
Cost:
$54,092
$32,859 576,481 $5,595 504 $4,264 - $4,865 883 $32,859
576,481
kWh
$5,595
504
kW-months/year
$4,264
-
$
$4,865
883
MMBtu
TOTAL IMPLEMENTED Savings:
$14,233
Cost:
$15,488
$10,183 178,653 - - - - $4,050 735 $10,183
178,653
kWh
-
-
kW-months/year
-
-
$
$4,050
735
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas