IAC logo
IAC Assessment: OK0893
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0893
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2014
Principal Product Metal fabrication
NAICS 332710 - Machine Shops
SIC 3599 - Industrial Machinery, Nec
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 60,000
Annual Production 2,160 Units
Production Hrs. Annual 3,300
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $57,402 1,184,680 kWh $0.05
Electricity Demand $40,142 5,454 kW-months/year $7.36
Natural Gas $8,018 980 MMBtu $8.19
TOTAL ENERGY COSTS $105,562
RECOMMENDED SAVINGS* $9,226 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,529
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,552
Cost:
$16,400
$4,365 90,100 $2,112 287 $(-925) (-113) $4,365
90,100
kWh
$2,112
287
kW-months/year
$(-925)
(-113)
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,270
Cost:
$1,850
$1,270 26,100 - - - - $1,270
26,100
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$428
Cost:
$1,867
$428 8,815 - - - - $428
8,815
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$1,497
Cost:
$700
$1,019 21,000 $478 65 - - $1,019
21,000
kWh
$478
65
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$480
Cost:
$250
$296 6,100 $184 25 - - $296
6,100
kWh
$184
25
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$9,226
Cost:
$21,067
$7,377 152,115 $2,775 377 $(-925) (-113) $7,377
152,115
kWh
$2,775
377
kW-months/year
$(-925)
(-113)
MMBtu
TOTAL IMPLEMENTED Savings:
$7,529
Cost:
$17,350
$5,679 117,200 $2,775 377 $(-925) (-113) $5,679
117,200
kWh
$2,775
377
kW-months/year
$(-925)
(-113)
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas