IAC Assessment: OK0898
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0898
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2014
Principal Product Ready mix concrete
NAICS 327320 - Ready-Mix Concrete Manufacturing
SIC 3273 - Ready-mixed Concrete
Sales $5,000,000-$10,000,000
# of Employees 100
Plant Area (Sq.Ft.) 45,256
Annual Production 550,000 Units
Production Hrs. Annual 3,744
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,597 1,154,760 kWh $0.08
Natural Gas $38,671 6,509 MMBtu $5.94
Fuel Oil #2 $20,273 18,194 MMBtu $1.11
TOTAL ENERGY COSTS $149,541
RECOMMENDED SAVINGS* $151,868 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,116
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Other Gas Other Liquid (non-haz) Ancillary Material Cost Water Consumption Electricity Usage Natural Gas Fuel Oil #2 Other Gas Other Liquid (non-haz) Ancillary Material Cost Water Consumption
$ kWh $ MMBtu $ MMBtu $ MMBtu $ gal $ $ $ Tgal
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$12,191
Cost:
$15,000
- - $12,191 2,052 - - - - - - - - - - -
-
kWh
$12,191
2,052
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$3,689
Cost:
$1,965
$3,689 46,117 - - - - - - - - - - - - $3,689
46,117
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,132
Cost:
$1,689
- - $1,132 191 - - - - - - - - - - -
-
kWh
$1,132
191
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
04: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$303
Cost:
$270
$303 3,786 - - - - - - - - - - - - $303
3,786
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,300
Cost:
$11,014
$4,300 53,760 - - - - - - - - - - - - $4,300
53,760
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,345
Cost:
$5,971
$1,345 16,817 - - - - - - - - - - - - $1,345
16,817
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$136
Cost:
$463
$136 1,703 - - - - - - - - - - - - $136
1,703
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
08: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$1,045
Cost:
$1,060
$1,045 13,061 - - - - - - - - - - - - $1,045
13,061
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$90
Cost:
$178
$90 1,128 - - - - - - - - - - - - $90
1,128
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
10: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$6,545
Cost:
$27,400
$3,058 38,225 $3,487 587 - - - - - - - - - - $3,058
38,225
kWh
$3,487
587
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
11: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$89,952
Cost:
$75,900
$(-1,515) (-18,938) - - - - - - $(-139) (-73) $91,607 - - - $(-1,515)
(-18,938)
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
$(-139)
(-73)
gal
$91,607
-
$
-
-
Tgal
12: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$20,273
Cost:
$45,000
- - - - $43,281 1,440 $(-23,008) (-1,458) - - - - - - -
-
kWh
-
-
MMBtu
$43,281
1,440
MMBtu
$(-23,008)
(-1,458)
MMBtu
-
-
gal
-
-
$
-
-
Tgal
13: 3.4159 REPLACE TREATED WATER WITH WELL / SURFACE WATER Savings:
$10,867
Cost:
$27,400
- - - - - - - - - - - - $10,867 - -
-
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
$10,867
-
Tgal
TOTAL RECOMMENDED Savings:
$151,868
Cost:
$213,310
$12,451 155,659 $16,810 2,830 $43,281 1,440 $(-23,008) (-1,458) $(-139) (-73) $91,607 - $10,867 - $12,451
155,659
kWh
$16,810
2,830
MMBtu
$43,281
1,440
MMBtu
$(-23,008)
(-1,458)
MMBtu
$(-139)
(-73)
gal
$91,607
-
$
$10,867
-
Tgal
TOTAL IMPLEMENTED Savings:
$8,116
Cost:
$29,822
$3,497 43,714 $4,619 778 - - - - - - - - - - $3,497
43,714
kWh
$4,619
778
MMBtu
-
-
MMBtu
-
-
MMBtu
-
-
gal
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ MMBtu $ gal $ $ $ Tgal
Electricity Usage Natural Gas Fuel Oil #2 Other Gas Other Liquid (non-haz) Ancillary Material Cost Water Consumption Electricity Usage Natural Gas Fuel Oil #2 Other Gas Other Liquid (non-haz) Ancillary Material Cost Water Consumption