IAC logo
IAC Assessment: OK0901
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0901
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2014
Principal Product Gas Plant and Gas Processing Equipments
NAICS 333132 - Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 100,000
Annual Production 761 Pieces
Production Hrs. Annual 5,200
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $247,947 3,709,385 kWh $0.07
Electricity Demand $52,184 13,443 kW-months/year $3.88
Natural Gas $134,272 20,228 MMBtu $6.64
TOTAL ENERGY COSTS $434,403
RECOMMENDED SAVINGS* $51,677 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,026
Cost:
$1,766
$1,026 15,375 - - - - $1,026
15,375
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,047
Cost:
$1,378
- - - - $3,047 459 -
-
kWh
-
-
kW-months/year
$3,047
459
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,102
Cost:
$1,890
$2,102 31,519 - - - - $2,102
31,519
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,328
Cost:
$24,267
$4,602 69,001 $726 187 - - $4,602
69,001
kWh
$726
187
kW-months/year
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$156
Cost:
$606
$95 1,427 - - $61 9 $95
1,427
kWh
-
-
kW-months/year
$61
9
MMBtu
06: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$40,018
Cost:
$156,997
$34,384 515,497 $5,634 1,452 - - $34,384
515,497
kWh
$5,634
1,452
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$51,677
Cost:
$186,904
$42,209 632,819 $6,360 1,639 $3,108 468 $42,209
632,819
kWh
$6,360
1,639
kW-months/year
$3,108
468
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas