IAC logo
IAC Assessment: OK0915
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0915
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2015
Principal Product Aircraft manufacturing
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $100,000,000-$500,000,000
# of Employees 411
Plant Area (Sq.Ft.) 356,250
Annual Production 2,263,800 Pieces
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $614,518 10,078,080 kWh $0.06
Electricity Demand $298,320 23,773 kW-months/year $12.55
Natural Gas $40,592 4,684 MMBtu $8.67
TOTAL ENERGY COSTS $953,430
RECOMMENDED SAVINGS* $152,178 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $83,574
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$58,176
Cost:
$103,015
$45,908 752,589 $12,268 978 - - - - - - $45,908
752,589
kWh
$12,268
978
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$17,688
Cost:
$25,096
$17,688 289,961 - - - - - - - - $17,688
289,961
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,867
Cost:
$20,538
$4,947 81,099 $1,920 153 - - - - - - $4,947
81,099
kWh
$1,920
153
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,060
Cost:
$24,180
$6,060 99,341 - - - - - - - - $6,060
99,341
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,077
Cost:
$6,900
$10,077 165,189 - - - - - - - - $10,077
165,189
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$7,439
Cost:
$14,107
$7,439 121,946 - - - - - - - - $7,439
121,946
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$674
Cost:
$382
$674 11,049 - - - - - - - - $674
11,049
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,441
Cost:
$14,342
$4,441 72,796 - - - - - - - - $4,441
72,796
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
09: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$6,741
Cost:
$3,938
$6,741 110,501 - - - - - - - - $6,741
110,501
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
10: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$8,266
Cost:
$63,126
$8,266 135,505 - - - - - - - - $8,266
135,505
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
11: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$1,720
Cost:
$3,060
$4,780 78,355 - - - - - - $(-3,060) - $4,780
78,355
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-3,060)
-
$
12: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING Savings:
$2,345
Cost:
$5,403
$154 2,532 $552 44 - - $1,639 189 - - $154
2,532
kWh
$552
44
kW-months/year
-
-
$
$1,639
189
MMBtu
-
-
$
13: 2.2491 USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING Savings:
$12,313
Cost:
$21,480
$8,473 138,905 $3,840 306 - - - - - - $8,473
138,905
kWh
$3,840
306
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
14: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,371
Cost:
$14,014
- - - - $9,371 - - - - - -
-
kWh
-
-
kW-months/year
$9,371
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$152,178
Cost:
$319,581
$125,648 2,059,768 $18,580 1,481 $9,371 - $1,639 189 $(-3,060) - $125,648
2,059,768
kWh
$18,580
1,481
kW-months/year
$9,371
-
$
$1,639
189
MMBtu
$(-3,060)
-
$
TOTAL IMPLEMENTED Savings:
$83,574
Cost:
$158,075
$72,446 1,187,622 $14,188 1,131 - - - - $(-3,060) - $72,446
1,187,622
kWh
$14,188
1,131
kW-months/year
-
-
$
-
-
MMBtu
$(-3,060)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Administrative Changes