IAC Assessment: OK0916
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0916
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2015
Principal Product Extruded Plastic Conduit
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084 - Plastics Pipe
Sales $1,000,000-$5,000,000
# of Employees 40
Plant Area (Sq.Ft.) 80,000
Annual Production 2,600,000 Pounds
Production Hrs. Annual 8,736
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $742,237 11,049,000 kWh $0.07
TOTAL ENERGY COSTS $742,237
RECOMMENDED SAVINGS* $85,580 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $47,343
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Administrative Changes Electricity Usage Electricity Fees Administrative Changes
$ kWh $ $ $ $
01: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$12,740
Cost:
-
$14,189 211,783 - - $(-1,449) - $14,189
211,783
kWh
-
-
$
$(-1,449)
-
$
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$16,433
Cost:
$20,074
$16,433 248,976 - - - - $16,433
248,976
kWh
-
-
$
-
-
$
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$30,382
Cost:
-
$30,382 460,380 - - - - $30,382
460,380
kWh
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,579
Cost:
$3,451
$2,579 38,495 - - - - $2,579
38,495
kWh
-
-
$
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$390
Cost:
$1,805
$390 5,821 - - - - $390
5,821
kWh
-
-
$
-
-
$
06: 2.7122 DISCONNECT BALLASTS Savings:
$2,547
Cost:
$2,064
$2,547 38,018 - - - - $2,547
38,018
kWh
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,606
Cost:
$5,687
$3,606 53,821 - - - - $3,606
53,821
kWh
-
-
$
-
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,788
Cost:
$26,134
- - $3,788 - - - -
-
kWh
$3,788
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,642
Cost:
$1,150
$1,642 24,506 - - - - $1,642
24,506
kWh
-
-
$
-
-
$
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$11,269
Cost:
$12,672
$11,269 168,191 - - - - $11,269
168,191
kWh
-
-
$
-
-
$
11: 2.6232 INSTALL SET-BACK TIMERS Savings:
$204
Cost:
$23
$204 3,086 - - - - $204
3,086
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$85,580
Cost:
$73,060
$83,241 1,253,077 $3,788 - $(-1,449) - $83,241
1,253,077
kWh
$3,788
-
$
$(-1,449)
-
$
TOTAL IMPLEMENTED Savings:
$47,343
Cost:
$4,601
$48,792 735,164 - - $(-1,449) - $48,792
735,164
kWh
-
-
$
$(-1,449)
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Electricity Fees Administrative Changes Electricity Usage Electricity Fees Administrative Changes