IAC logo
IAC Assessment: OK0921
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0921
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2015
Principal Product plastic pipes
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084 - Plastics Pipe
Sales $50,000,000-$100,000,000
# of Employees 50
Plant Area (Sq.Ft.) 120,000
Annual Production 58,000,000 Pounds
Production Hrs. Annual 8,664
Location (State) AR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $571,432 15,790,656 kWh $0.04
Electricity Demand $367,794 23,569 kW-months/year $15.60
Natural Gas $21,933 2,403 MMBtu $9.13
TOTAL ENERGY COSTS $961,159
RECOMMENDED SAVINGS* $155,425 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $143,398
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,838
Cost:
$28,060
$4,397 138,270 $3,441 192 $4,397
138,270
kWh
$3,441
192
kW-months/year
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,026
Cost:
$832
- - $12,026 691 -
-
kWh
$12,026
691
kW-months/year
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$13,915
Cost:
$4,348
$8,058 253,381 $5,858 326 $8,058
253,381
kWh
$5,858
326
kW-months/year
04: 2.7273 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM Savings:
$89,313
Cost:
$72,000
$44,932 1,412,954 $44,381 2,470 $44,932
1,412,954
kWh
$44,381
2,470
kW-months/year
05: 2.5123 REDUCE FLUID FLOW RATES Savings:
$32,332
Cost:
$5,000
$18,137 570,351 $14,195 790 $18,137
570,351
kWh
$14,195
790
kW-months/year
TOTAL RECOMMENDED Savings:
$155,425
Cost:
$110,240
$75,524 2,374,956 $79,901 4,469 $75,524
2,374,956
kWh
$79,901
4,469
kW-months/year
TOTAL IMPLEMENTED Savings:
$143,398
Cost:
$109,408
$75,524 2,374,956 $67,875 3,778 $75,524
2,374,956
kWh
$67,875
3,778
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand