Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2016 |
Principal Product | Animal Feed |
NAICS | 311119 - Other Animal Food Manufacturing |
SIC | 2048 - Prepared Feeds, Nec |
Sales | $5,000,000-$10,000,000 |
# of Employees | 42 |
Plant Area (Sq.Ft.) | 140,000 |
Annual Production | 180,000 Tons |
Production Hrs. Annual | 6,432 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $272,338 | 4,502,400 | kWh | $0.06 |
Electricity Demand | $81,607 | 14,046 | kW-months/year | $5.81 |
Natural Gas | $50,062 | 15,406 | MMBtu | $3.25 |
TOTAL ENERGY COSTS | $412,289 | |||
RECOMMENDED SAVINGS* | $132,954 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $14,458 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Administrative Changes | Electricity Usage | Electricity Fees | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,095 Cost: $1,646 |
- | - | - | - | $1,095 | 337 | - | - |
- - kWh |
- - $ |
$1,095 337 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,667 Cost: $5,324 |
$1,667 | 27,782 | - | - | - | - | - | - |
$1,667 27,782 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $9,346 Cost: $88,560 |
$9,346 | 133,560 | - | - | - | - | - | - |
$9,346 133,560 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $3,363 Cost: $15,376 |
- | - | - | - | $3,363 | 1,035 | - | - |
- - kWh |
- - $ |
$3,363 1,035 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $3,445 Cost: $12,000 |
- | - | - | - | $3,445 | 1,060 | - | - |
- - kWh |
- - $ |
$3,445 1,060 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,197 Cost: $2,060 |
$1,197 | 19,950 | - | - | - | - | - | - |
$1,197 19,950 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
Savings: $74,720 Cost: $594,190 |
- | - | $27,896 | - | $46,824 | 14,408 | - | - |
- - kWh |
$27,896 - $ |
$46,824 14,408 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $9,089 Cost: $6,160 |
- | - | - | - | - | - | $9,089 | - |
- - kWh |
- - $ |
- - MMBtu |
$9,089 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $29,032 Cost: $132,000 |
$29,032 | 483,876 | - | - | - | - | - | - |
$29,032 483,876 kWh |
- - $ |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $132,954 Cost: $857,316 |
$41,242 | 665,168 | $27,896 | - | $54,727 | 16,840 | $9,089 | - | $41,242 665,168 kWh |
$27,896 - $ |
$54,727 16,840 MMBtu |
$9,089 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $14,458 Cost: $105,884 |
$11,013 | 161,342 | - | - | $3,445 | 1,060 | - | - | $11,013 161,342 kWh |
- - $ |
$3,445 1,060 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Administrative Changes | Electricity Usage | Electricity Fees | Natural Gas | Administrative Changes |