Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2016 |
Principal Product | Plastic bottles |
NAICS | 326160 - Plastics Bottle Manufacturing |
SIC | 3085 - Plastics Bottles |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 125,000 |
Annual Production | 30,000,000 Pieces |
Production Hrs. Annual | 8,760 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,794,373 | 36,439,800 | kWh | $0.05 |
Electricity Demand | $374,390 | 69,330 | kW-months/year | $5.40 |
Natural Gas | $35,309 | 9,150 | MMBtu | $3.86 |
TOTAL ENERGY COSTS | $2,204,072 | |||
RECOMMENDED SAVINGS* | $835,324 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $75,715 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $34,651 Cost: $40,660 |
$30,180 | 608,258 | $4,471 | 828 | - | - | - | - |
$30,180 608,258 kWh |
$4,471 828 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $45,405 Cost: $59,664 |
$45,405 | 922,893 | - | - | - | - | - | - |
$45,405 922,893 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $16,558 Cost: $4,930 |
$16,558 | 334,518 | - | - | - | - | - | - |
$16,558 334,518 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $13,124 Cost: $3,000 |
$13,124 | 267,828 | - | - | - | - | - | - |
$13,124 267,828 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $317 Cost: $344 |
$155 | 3,149 | - | - | - | - | $162 | 42 |
$155 3,149 kWh |
- - kW-months/year |
- - $ |
$162 42 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3311 REPLACE DC EQUIPMENT WITH AC EQUIPMENT |
Savings: $5,044 Cost: $44,525 |
$5,044 | 102,527 | - | - | - | - | - | - |
$5,044 102,527 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $4,491 Cost: $2,935 |
$4,491 | 91,282 | - | - | - | - | - | - |
$4,491 91,282 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $4,294 Cost: $5,000 |
$3,398 | 69,360 | $896 | 166 | - | - | - | - |
$3,398 69,360 kWh |
$896 166 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $3,693 Cost: $3,236 |
$3,693 | 75,076 | - | - | - | - | - | - |
$3,693 75,076 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $372,611 Cost: $70,000 |
- | - | - | - | $372,611 | - | - | - |
- - kWh |
- - kW-months/year |
$372,611 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $26,300 Cost: $47,542 |
- | - | - | - | $26,300 | - | - | - |
- - kWh |
- - kW-months/year |
$26,300 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.3417 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT |
Savings: $308,836 Cost: $1,371,615 |
$188,383 | 3,844,560 | - | - | $406,446 | - | $(-285,993) | (-74,284) |
$188,383 3,844,560 kWh |
- - kW-months/year |
$406,446 - $ |
$(-285,993) (-74,284) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $835,324 Cost: $1,653,451 |
$310,431 | 6,319,451 | $5,367 | 994 | $805,357 | - | $(-285,831) | (-74,242) | $310,431 6,319,451 kWh |
$5,367 994 kW-months/year |
$805,357 - $ |
$(-285,831) (-74,242) MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $75,715 Cost: $110,786 |
$49,253 | 1,001,118 | - | - | $26,300 | - | $162 | 42 | $49,253 1,001,118 kWh |
- - kW-months/year |
$26,300 - $ |
$162 42 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |