IAC logo
IAC Assessment: OK0941
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0941
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2016
Principal Product Cash management systems
NAICS 333318 - Other Commercial and Service Industry Machinery Manufacturing
SIC 3578 - Calculating And Accounting Equipment
Sales $50,000,000-$100,000,000
# of Employees 145
Plant Area (Sq.Ft.) 75,000
Annual Production 11,000 Pieces
Production Hrs. Annual 3,120
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,272 777,100 kWh $0.06
Electricity Demand $21,175 2,562 kW-months/year $8.26
Natural Gas $4,022 545 MMBtu $7.38
TOTAL ENERGY COSTS $72,469
RECOMMENDED SAVINGS* $16,277 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,259
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$3,672
Cost:
$11,835
$3,672 60,196 - - - - $3,672
60,196
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,732
Cost:
$245
$2,186 35,832 - - $546 74 $2,186
35,832
kWh
-
-
kW-months/year
$546
74
MMBtu
03: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$1,497
Cost:
$1,960
$1,201 19,687 $296 36 - - $1,201
19,687
kWh
$296
36
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,762
Cost:
$25,920
$5,104 83,678 $2,658 322 - - $5,104
83,678
kWh
$2,658
322
kW-months/year
-
-
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$454
Cost:
-
$454 7,448 - - - - $454
7,448
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$102
Cost:
$350
$102 1,680 - - - - $102
1,680
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$58
Cost:
$336
$58 953 - - - - $58
953
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$16,277
Cost:
$40,646
$12,777 209,474 $2,954 358 $546 74 $12,777
209,474
kWh
$2,954
358
kW-months/year
$546
74
MMBtu
TOTAL IMPLEMENTED Savings:
$9,259
Cost:
$27,880
$6,305 103,365 $2,954 358 - - $6,305
103,365
kWh
$2,954
358
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas