IAC Assessment: OK0949
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0949
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2016
Principal Product Coated aluminum, smart levels
NAICS 332510 - Hardware Manufacturing
SIC 3429 - Hardware, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 300,000
Annual Production 500,000 Pounds
Production Hrs. Annual 7,488
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $268,076 4,813,498 kWh $0.06
Electricity Demand $79,626 13,727 kW-months/year $5.80
Natural Gas $92,264 24,039 MMBtu $3.84
TOTAL ENERGY COSTS $439,966
RECOMMENDED SAVINGS* $131,590 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$17,826
Cost:
$50,400
$14,903 266,129 $2,923 504 - - - - - - $14,903
266,129
kWh
$2,923
504
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$5,613
Cost:
$3,847
$5,613 100,236 - - - - - - - - $5,613
100,236
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,319
Cost:
$5,020
$1,319 23,559 - - - - - - - - $1,319
23,559
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$720
Cost:
$1,313
$720 12,854 - - - - - - - - $720
12,854
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
05: 2.1212 OPERATE BOILERS ON HIGH FIRE SETTING Savings:
$10,228
Cost:
$44,000
- - - - - - $10,228 2,665 - - -
-
kWh
-
-
kW-months/year
-
-
$
$10,228
2,665
MMBtu
-
-
$
06: 2.2514 COVER OPEN TANKS Savings:
$9,702
Cost:
$850
- - - - - - $9,702 2,528 - - -
-
kWh
-
-
kW-months/year
-
-
$
$9,702
2,528
MMBtu
-
-
$
07: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$74,759
Cost:
$284,084
$117,411 2,096,640 $19,488 3,360 - - $(-41,174) (-10,728) $(-20,966) - $117,411
2,096,640
kWh
$19,488
3,360
kW-months/year
-
-
$
$(-41,174)
(-10,728)
MMBtu
$(-20,966)
-
$
08: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,423
Cost:
$30,600
- - - - $11,423 - - - - - -
-
kWh
-
-
kW-months/year
$11,423
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$131,590
Cost:
$420,114
$139,966 2,499,418 $22,411 3,864 $11,423 - $(-21,244) (-5,535) $(-20,966) - $139,966
2,499,418
kWh
$22,411
3,864
kW-months/year
$11,423
-
$
$(-21,244)
(-5,535)
MMBtu
$(-20,966)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes