IAC logo
IAC Assessment: OK0956
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0956
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2016
Principal Product Animal feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 90,000
Annual Production 85,000 Units
Production Hrs. Annual 6,240
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $189,594 2,625,596 kWh $0.07
Natural Gas $33,594 8,594 MMBtu $3.91
TOTAL ENERGY COSTS $223,188
RECOMMENDED SAVINGS* $45,723 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,844
Cost:
$7,700
- - $3,844 983 -
-
kWh
$3,844
983
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,155
Cost:
$2,536
$3,155 43,820 - - $3,155
43,820
kWh
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,914
Cost:
$51,634
$8,914 123,810 - - $8,914
123,810
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,000
Cost:
$1,488
$1,000 13,891 - - $1,000
13,891
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,910
Cost:
$3,000
$2,910 40,423 - - $2,910
40,423
kWh
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$492
Cost:
$1,325
$492 6,792 - - $492
6,792
kWh
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,027
Cost:
$34,182
$25,027 346,610 - - $25,027
346,610
kWh
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$145
Cost:
$180
- - $145 37 -
-
kWh
$145
37
MMBtu
09: 2.6232 INSTALL SET-BACK TIMERS Savings:
$237
Cost:
$50
$123 1,710 $113 29 $123
1,710
kWh
$113
29
MMBtu
TOTAL RECOMMENDED Savings:
$45,723
Cost:
$102,095
$41,621 577,056 $4,102 1,049 $41,621
577,056
kWh
$4,102
1,049
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas