IAC logo
IAC Assessment: OK0964
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0964
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2017
Principal Product Fiberglass pipe
NAICS 326121 - Unlaminated Plastics Profile Shape Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 195,000
Annual Production 778,072 Units
Production Hrs. Annual 2,158
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $175,799 3,974,600 kWh $0.04
Electricity Demand $33,335 11,791 kW-months/year $2.83
Natural Gas $116,022 27,595 MMBtu $4.20
TOTAL ENERGY COSTS $325,156
RECOMMENDED SAVINGS* $46,533 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,682
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$10,155
Cost:
-
$10,155 230,814 - - - - $10,155
230,814
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,164
Cost:
$3,000
$6,164 140,107 - - - - $6,164
140,107
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$246
Cost:
$800
$246 5,604 - - - - $246
5,604
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,682
Cost:
$38,281
$4,380 99,564 $1,302 461 - - $4,380
99,564
kWh
$1,302
461
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$798
Cost:
$4,528
$615 13,977 $183 65 - - $615
13,977
kWh
$183
65
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,333
Cost:
$4,260
$1,333 30,307 - - - - $1,333
30,307
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,216
Cost:
$5,750
- - - - $4,216 1,003 -
-
kWh
-
-
kW-months/year
$4,216
1,003
MMBtu
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,602
Cost:
$7,700
- - - - $1,602 381 -
-
kWh
-
-
kW-months/year
$1,602
381
MMBtu
09: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,883
Cost:
$1,250
- - - - $8,883 2,113 -
-
kWh
-
-
kW-months/year
$8,883
2,113
MMBtu
10: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,734
Cost:
$2,072
- - - - $1,734 413 -
-
kWh
-
-
kW-months/year
$1,734
413
MMBtu
11: 2.6232 INSTALL SET-BACK TIMERS Savings:
$5,720
Cost:
$4,750
$608 13,830 - - $5,112 1,216 $608
13,830
kWh
-
-
kW-months/year
$5,112
1,216
MMBtu
TOTAL RECOMMENDED Savings:
$46,533
Cost:
$72,391
$23,501 534,203 $1,485 526 $21,547 5,126 $23,501
534,203
kWh
$1,485
526
kW-months/year
$21,547
5,126
MMBtu
TOTAL IMPLEMENTED Savings:
$5,682
Cost:
$38,281
$4,380 99,564 $1,302 461 - - $4,380
99,564
kWh
$1,302
461
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas