IAC logo
IAC Assessment: OK0965
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0965
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2017
Principal Product Wind turbine nacelle and hubs
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales >$500,000,000
# of Employees 360
Plant Area (Sq.Ft.) 300,000
Annual Production 200 Units
Production Hrs. Annual 5,148
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $214,689 4,906,500 kWh $0.04
Electricity Demand $285,946 12,985 kW-months/year $22.02
Electricity Fees $3,146 - $ -
Natural Gas $36,990 4,919 MMBtu $7.52
TOTAL ENERGY COSTS $540,771
RECOMMENDED SAVINGS* $56,921 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,494
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$41,787
Cost:
$55,459
$15,670 356,129 $26,117 1,186 - - $15,670
356,129
kWh
$26,117
1,186
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,915
Cost:
$25,287
$6,915 157,154 - - - - $6,915
157,154
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,316
Cost:
$6,286
$281 6,378 $1,035 47 - - $281
6,378
kWh
$1,035
47
kW-months/year
-
-
MMBtu
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$765
Cost:
$3,975
$765 17,393 - - - - $765
17,393
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$918
Cost:
$3,250
$257 5,850 $661 30 - - $257
5,850
kWh
$661
30
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$858
Cost:
$4,081
$858 19,504 - - - - $858
19,504
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$500
Cost:
$325
$500 11,373 - - - - $500
11,373
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$353
Cost:
$919
- - - - $353 47 -
-
kWh
-
-
kW-months/year
$353
47
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$159
Cost:
-
$159 3,604 - - - - $159
3,604
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,351
Cost:
-
$1,854 42,145 - - $1,496 199 $1,854
42,145
kWh
-
-
kW-months/year
$1,496
199
MMBtu
TOTAL RECOMMENDED Savings:
$56,921
Cost:
$99,582
$27,259 619,530 $27,813 1,263 $1,849 246 $27,259
619,530
kWh
$27,813
1,263
kW-months/year
$1,849
246
MMBtu
TOTAL IMPLEMENTED Savings:
$49,494
Cost:
$73,376
$20,185 458,772 $27,813 1,263 $1,496 199 $20,185
458,772
kWh
$27,813
1,263
kW-months/year
$1,496
199
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas