IAC Assessment: OK0966
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2017
Principal Product Oil field equipment
NAICS 333132 - Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533 - Oil And Gas Field Machinery
Sales >$500,000,000
# of Employees 635
Plant Area (Sq.Ft.) 727,191
Annual Production 1,000,000 Units
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $687,451 25,461,155 kWh $0.03
Electricity Demand $417,116 107,546 kW-months/year $3.88
Natural Gas $748,631 119,781 MMBtu $6.25
TOTAL ENERGY COSTS $1,853,198
RECOMMENDED SAVINGS* $337,800 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $201,958
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.1224 REPLACE BOILER Savings:
$125,000
Cost:
$442,000
- - - - - - $125,000 20,000 -
-
kWh
-
-
kW-months/year
-
-
$
$125,000
20,000
MMBtu
02: 2.8115 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED Savings:
$113,700
Cost:
$24,000
- - - - $113,700 - - - -
-
kWh
-
-
kW-months/year
$113,700
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$74,450
Cost:
$305,694
$49,270 1,824,833 $25,180 3,476 - - - - $49,270
1,824,833
kWh
$25,180
3,476
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,526
Cost:
$21,137
$2,335 86,468 $1,191 164 - - - - $2,335
86,468
kWh
$1,191
164
kW-months/year
-
-
$
-
-
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,886
Cost:
-
$5,800 214,893 $2,086 288 - - - - $5,800
214,893
kWh
$2,086
288
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,570
Cost:
$17,250
$6,570 243,310 - - - - - - $6,570
243,310
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,676
Cost:
$17,550
$3,676 136,172 - - - - - - $3,676
136,172
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
08: 2.2514 COVER OPEN TANKS Savings:
$2,956
Cost:
$1,250
- - - - - - $2,956 473 -
-
kWh
-
-
kW-months/year
-
-
$
$2,956
473
MMBtu
09: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$36
Cost:
$100
- - - - - - $36 6 -
-
kWh
-
-
kW-months/year
-
-
$
$36
6
MMBtu
TOTAL RECOMMENDED Savings:
$337,800
Cost:
$828,981
$67,651 2,505,676 $28,457 3,928 $113,700 - $127,992 20,479 $67,651
2,505,676
kWh
$28,457
3,928
kW-months/year
$113,700
-
$
$127,992
20,479
MMBtu
TOTAL IMPLEMENTED Savings:
$201,958
Cost:
$385,731
$61,851 2,290,783 $26,371 3,640 $113,700 - $36 6 $61,851
2,290,783
kWh
$26,371
3,640
kW-months/year
$113,700
-
$
$36
6
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas