IAC logo
IAC Assessment: OK0968
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0968
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2017
Principal Product Steel rod coil
NAICS 331110 - Iron and Steel Mills and Ferroalloy Manufacturing
SIC 3312 - Blast Furnaces And Steel Mills
Sales $100,000,000-$500,000,000
# of Employees 200
Plant Area (Sq.Ft.) 280,000
Annual Production 285,000 Tons
Production Hrs. Annual 6,240
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $5,420,634 171,432,800 kWh $0.03
Electricity Demand $2,046,092 607,149 kW-months/year $3.37
Natural Gas $1,405,796 459,651 MMBtu $3.06
TOTAL ENERGY COSTS $8,872,522
RECOMMENDED SAVINGS* $922,605 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $94,690
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,259
Cost:
$3,000
$17,259 539,330 - - - - $17,259
539,330
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$5,490
Cost:
-
$4,571 142,853 $919 273 - - $4,571
142,853
kWh
$919
273
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,554
Cost:
$1,388
$3,554 111,049 - - - - $3,554
111,049
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$55,717
Cost:
$159,110
$48,693 1,521,664 $7,024 2,084 - - $48,693
1,521,664
kWh
$7,024
2,084
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,670
Cost:
$90,081
$12,670 395,937 - - - - $12,670
395,937
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.5114 USE SHAFT TYPE FURNACES FOR PREHEATING INCOMING MATERIAL Savings:
$670,334
Cost:
$2,422,500
$547,200 17,100,000 $123,134 36,538 - - $547,200
17,100,000
kWh
$123,134
36,538
kW-months/year
-
-
MMBtu
07: 2.2524 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED Savings:
$157,581
Cost:
$3,000
- - - - $157,581 51,531 -
-
kWh
-
-
kW-months/year
$157,581
51,531
MMBtu
TOTAL RECOMMENDED Savings:
$922,605
Cost:
$2,679,079
$633,947 19,810,833 $131,077 38,895 $157,581 51,531 $633,947
19,810,833
kWh
$131,077
38,895
kW-months/year
$157,581
51,531
MMBtu
TOTAL IMPLEMENTED Savings:
$94,690
Cost:
$253,579
$86,747 2,710,833 $7,943 2,357 - - $86,747
2,710,833
kWh
$7,943
2,357
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas