IAC Assessment: OK0969
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2017
Principal Product Catalyst
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 51
Plant Area (Sq.Ft.) 128,476
Annual Production 700,000,000 Units
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $288,685 4,189,278 kWh $0.07
Natural Gas $162,452 37,026 MMBtu $4.39
TOTAL ENERGY COSTS $451,137
RECOMMENDED SAVINGS* $94,207 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $33,330
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas
$ kWh $ $ $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$23,730
Cost:
$42,000
- - - - $23,730 5,408 -
-
kWh
-
-
$
$23,730
5,408
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,000
Cost:
$48,139
$29,000 420,287 - - - - $29,000
420,287
kWh
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$532
Cost:
$4,727
$532 7,714 - - - - $532
7,714
kWh
-
-
$
-
-
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$12,697
Cost:
$2,712
$12,697 184,203 - - - - $12,697
184,203
kWh
-
-
$
-
-
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,138
Cost:
$23,262
$21,138 306,355 - - - - $21,138
306,355
kWh
-
-
$
-
-
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,384
Cost:
$16,995
- - $2,384 - - - -
-
kWh
$2,384
-
$
-
-
MMBtu
07: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$4,330
Cost:
-
- - $4,330 - - - -
-
kWh
$4,330
-
$
-
-
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$396
Cost:
$148
$396 5,735 - - - - $396
5,735
kWh
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$94,207
Cost:
$137,983
$63,763 924,294 $6,714 - $23,730 5,408 $63,763
924,294
kWh
$6,714
-
$
$23,730
5,408
MMBtu
TOTAL IMPLEMENTED Savings:
$33,330
Cost:
$48,139
$29,000 420,287 $4,330 - - - $29,000
420,287
kWh
$4,330
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ $ $ MMBtu
Electricity Usage Electricity Fees Natural Gas Electricity Usage Electricity Fees Natural Gas