IAC logo
IAC Assessment: OK0974
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0974
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2017
Principal Product Fluid transfer pumps & meters
NAICS 333911 - Pump and Pumping Equipment Manufacturing
SIC 3561 - Pumps And Pumping Equipment
Sales $50,000,000-$100,000,000
# of Employees 210
Plant Area (Sq.Ft.) 174,000
Annual Production 400,000 Units
Production Hrs. Annual 6,240
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,312 1,755,818 kWh $0.04
Electricity Demand $128,035 6,114 kW-months/year $20.94
Electricity Fees $1,200 - $ -
Natural Gas $5,650 845 MMBtu $6.69
TOTAL ENERGY COSTS $208,197
RECOMMENDED SAVINGS* $33,751 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,407
Cost:
$15,373
- - - - $12,407 - -
-
kWh
-
-
kW-months/year
$12,407
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,219
Cost:
$12,710
$1,785 42,501 $3,434 164 - - $1,785
42,501
kWh
$3,434
164
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,588
Cost:
$7,868
$881 20,987 $3,707 177 - - $881
20,987
kWh
$3,707
177
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,524
Cost:
$11,407
$1,304 31,051 $2,220 106 - - $1,304
31,051
kWh
$2,220
106
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,726
Cost:
-
$2,726 64,896 - - - - $2,726
64,896
kWh
-
-
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$975
Cost:
$691
$975 23,209 - - - - $975
23,209
kWh
-
-
kW-months/year
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$414
Cost:
-
$414 9,859 - - - - $414
9,859
kWh
-
-
kW-months/year
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$309
Cost:
$191
$309 7,363 - - - - $309
7,363
kWh
-
-
kW-months/year
-
-
$
09: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,589
Cost:
$11,640
$1,118 26,620 $2,471 118 - - $1,118
26,620
kWh
$2,471
118
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$33,751
Cost:
$59,880
$9,512 226,486 $11,832 565 $12,407 - $9,512
226,486
kWh
$11,832
565
kW-months/year
$12,407
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees