IAC logo
IAC Assessment: OK0979
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0979
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2017
Principal Product metal parts
NAICS 332721 - Precision Turned Product Manufacturing
SIC 3451 - Screw Machine Products
Sales $5,000,000-$10,000,000
# of Employees 55
Plant Area (Sq.Ft.) 46,200
Annual Production 1,000,000 Units
Production Hrs. Annual 4,602
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,531 1,394,160 kWh $0.08
Natural Gas $2,114 334 MMBtu $6.33
TOTAL ENERGY COSTS $109,645
RECOMMENDED SAVINGS* $22,743 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,331
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$4,648
Cost:
$6,600
$4,648 61,161 - - $4,648
61,161
kWh
-
-
MMBtu
02: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$1,410
Cost:
$1,400
$1,410 18,550 - - $1,410
18,550
kWh
-
-
MMBtu
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,833
Cost:
$2,600
$1,289 16,955 $544 86 $1,289
16,955
kWh
$544
86
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,621
Cost:
$42,413
$10,621 139,744 - - $10,621
139,744
kWh
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,344
Cost:
$2,184
$1,344 17,679 - - $1,344
17,679
kWh
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$798
Cost:
-
$798 10,505 - - $798
10,505
kWh
-
-
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,331
Cost:
$1,000
$1,331 17,509 - - $1,331
17,509
kWh
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$758
Cost:
$1,100
$758 9,978 - - $758
9,978
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$22,743
Cost:
$57,297
$22,199 292,081 $544 86 $22,199
292,081
kWh
$544
86
MMBtu
TOTAL IMPLEMENTED Savings:
$1,331
Cost:
$1,000
$1,331 17,509 - - $1,331
17,509
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas