IAC Assessment: OK0980
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0980
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2018
Principal Product Munition
NAICS 332993 - Ammunition (except Small Arms) Manufacturing
SIC 3483 - Ammunition, Exc. For Small Arms, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 927,495
Annual Production 1,000,000 Units
Production Hrs. Annual 2,080
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,442 2,280,991 kWh $0.06
Electricity Demand $108,192 7,041 kW-months/year $15.37
Fuel Oil #2 $62,628 4,371 MMBtu $14.33
Fuel Oil #6 $97,621 11,260 MMBtu $8.67
TOTAL ENERGY COSTS $399,883
RECOMMENDED SAVINGS* $76,107 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,254
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Fuel Oil #6 Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Fuel Oil #6
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$12,254
Cost:
$1,350
$12,254 211,274 - - - - - - - - $12,254
211,274
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
02: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,443
Cost:
$4,790
$650 11,211 $793 52 - - - - - - $650
11,211
kWh
$793
52
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,611
Cost:
$7,298
$707 12,191 $904 59 - - - - - - $707
12,191
kWh
$904
59
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$23,198
Cost:
$23,580
- - - - - - $9,439 661 $13,759 1,596 -
-
kWh
-
-
kW-months/year
-
-
$
$9,439
661
MMBtu
$13,759
1,596
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$24,343
Cost:
$31,350
- - - - - - $9,905 693 $14,438 1,675 -
-
kWh
-
-
kW-months/year
-
-
$
$9,905
693
MMBtu
$14,438
1,675
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,258
Cost:
$16,892
- - - - $13,258 - - - - - -
-
kWh
-
-
kW-months/year
$13,258
-
$
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$76,107
Cost:
$85,260
$13,611 234,676 $1,697 110 $13,258 - $19,344 1,354 $28,197 3,271 $13,611
234,676
kWh
$1,697
110
kW-months/year
$13,258
-
$
$19,344
1,354
MMBtu
$28,197
3,271
MMBtu
TOTAL IMPLEMENTED Savings:
$12,254
Cost:
$1,350
$12,254 211,274 - - - - - - - - $12,254
211,274
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Fuel Oil #6 Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Fuel Oil #6