IAC Assessment: OK0985
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0985
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2018
Principal Product Vehicle Bumpers
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 500
Plant Area (Sq.Ft.) 350,000
Annual Production 400,000 Units
Production Hrs. Annual 6,864
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,415,030 40,429,440 kWh $0.03
Electricity Demand $48,934 6,314 kW-months/year $7.75
Natural Gas $385,279 76,308 MMBtu $5.05
TOTAL ENERGY COSTS $1,849,243
RECOMMENDED SAVINGS* $117,326 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,042
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$758
Cost:
$592
$283 8,092 - - $475 94 $283
8,092
kWh
-
-
kW-months/year
$475
94
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,240
Cost:
$19,498
$16,697 477,062 $543 70 - - $16,697
477,062
kWh
$543
70
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,769
Cost:
$21,562
$4,622 132,064 $147 19 - - $4,622
132,064
kWh
$147
19
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,033
Cost:
$7,422
$2,033 58,089 - - - - $2,033
58,089
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$12,555
Cost:
$3,157
$12,555 358,718 - - - - $12,555
358,718
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$79,971
Cost:
$7,481
$79,971 2,284,887 - - - - $79,971
2,284,887
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$117,326
Cost:
$59,712
$116,161 3,318,912 $690 89 $475 94 $116,161
3,318,912
kWh
$690
89
kW-months/year
$475
94
MMBtu
TOTAL IMPLEMENTED Savings:
$24,042
Cost:
$48,482
$23,352 667,215 $690 89 - - $23,352
667,215
kWh
$690
89
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas