Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2018
Principal Product Bathtubs
NAICS 326191 - Plastics Plumbing Fixture Manufacturing
SIC 3088 - Plastics Plumbing Fixtures
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 60,000
Annual Production 20,500 Units
Production Hrs. Annual 2,184
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,833 964,920 kWh $0.07
Electricity Demand $39,088 3,704 kW-months/year $10.55
Natural Gas $33,894 4,689 MMBtu $7.23
TOTAL ENERGY COSTS $139,815
RECOMMENDED SAVINGS* $7,467 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,411
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$525
Cost:
$1,755
$525 7,604 - - - - - - $525
7,604
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$171
Cost:
$1,243
$171 2,471 - - - - - - $171
2,471
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$308
Cost:
$259
$181 2,621 $127 12 - - - - $181
2,621
kWh
$127
12
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$604
Cost:
$450
$604 8,757 - - - - - - $604
8,757
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$208
Cost:
-
$208 3,020 - - - - - - $208
3,020
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$2,701
Cost:
$15,796
$2,701 39,148 - - - - - - $2,701
39,148
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.6232 INSTALL SET-BACK TIMERS Savings:
$2,280
Cost:
$1,284
$797 11,543 - - - - $1,483 205 $797
11,543
kWh
-
-
kW-months/year
-
-
$
$1,483
205
MMBtu
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$360
Cost:
$45
- - - - $360 - - - -
-
kWh
-
-
kW-months/year
$360
-
$
-
-
MMBtu
09: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$310
Cost:
-
- - - - $310 - - - -
-
kWh
-
-
kW-months/year
$310
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$7,467
Cost:
$20,832
$5,187 75,164 $127 12 $670 - $1,483 205 $5,187
75,164
kWh
$127
12
kW-months/year
$670
-
$
$1,483
205
MMBtu
TOTAL IMPLEMENTED Savings:
$6,411
Cost:
$17,789
$4,491 65,089 $127 12 $310 - $1,483 205 $4,491
65,089
kWh
$127
12
kW-months/year
$310
-
$
$1,483
205
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas