IAC logo
IAC Assessment: OK1003
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1003
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2019
Principal Product soft drinks
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 471,000
Annual Production 35,000,000 Units
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $483,030 13,054,858 kWh $0.04
Electricity Demand $263,579 30,577 kW-months/year $8.62
Electricity Fees $10,123 - $ -
Natural Gas $206,507 52,815 MMBtu $3.91
TOTAL ENERGY COSTS $1,221,536
RECOMMENDED SAVINGS* $92,422 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $77,493
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,820
Cost:
$1,545
$2,820 76,224 - - - - - - - - $2,820
76,224
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,094
Cost:
$11,817
$2,094 56,604 - - - - - - - - $2,094
56,604
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,476
Cost:
$56,018
$10,218 276,159 $3,258 378 - - - - - - $10,218
276,159
kWh
$3,258
378
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT Savings:
$1,431
Cost:
$7,700
- - - - - - $1,431 366 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,431
366
MMBtu
-
-
Tgal
05: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$10,817
Cost:
$1,400
- - - - - - - - $10,817 3,154 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$10,817
3,154
Tgal
06: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$9,631
Cost:
-
- - - - $9,631 - - - - - -
-
kWh
-
-
kW-months/year
$9,631
-
$
-
-
MMBtu
-
-
Tgal
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$48,286
Cost:
$9,545
$48,286 1,305,029 - - - - - - - - $48,286
1,305,029
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,867
Cost:
$4,544
- - - - $3,867 - - - - - -
-
kWh
-
-
kW-months/year
$3,867
-
$
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$92,422
Cost:
$92,569
$63,418 1,714,016 $3,258 378 $13,498 - $1,431 366 $10,817 3,154 $63,418
1,714,016
kWh
$3,258
378
kW-months/year
$13,498
-
$
$1,431
366
MMBtu
$10,817
3,154
Tgal
TOTAL IMPLEMENTED Savings:
$77,493
Cost:
$80,325
$63,418 1,714,016 $3,258 378 - - - - $10,817 3,154 $63,418
1,714,016
kWh
$3,258
378
kW-months/year
-
-
$
-
-
MMBtu
$10,817
3,154
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage