IAC Assessment: OK1005
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1005
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2019
Principal Product bio-solid
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $10,000,000-$50,000,000
# of Employees 62
Plant Area (Sq.Ft.) 233,243
Annual Production 4,800 Tons
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $840,480 21,012,000 kWh $0.04
Electricity Demand $641,779 34,560 kW-months/year $18.57
Electricity Fees $41,606 - $ -
Natural Gas $107,961 27,471 MMBtu $3.93
TOTAL ENERGY COSTS $1,631,826
RECOMMENDED SAVINGS* $243,187 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$127,275
Cost:
$96,138
$127,275 3,181,876 - - - - - - $127,275
3,181,876
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,747
Cost:
$27,232
$11,747 293,686 - - - - - - $11,747
293,686
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,742
Cost:
$13,761
$11,742 293,543 - - - - - - $11,742
293,543
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$7,674
Cost:
$34,500
$7,674 191,844 - - - - - - $7,674
191,844
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$59,363
Cost:
$100,260
$40,548 1,013,695 $18,815 1,013 - - - - $40,548
1,013,695
kWh
$18,815
1,013
kW-months/year
-
-
$
-
-
MMBtu
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$20,771
Cost:
$24,531
- - - - $20,771 - - - -
-
kWh
-
-
kW-months/year
$20,771
-
$
-
-
MMBtu
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$1,218
Cost:
$5,291
$1,218 30,439 - - - - - - $1,218
30,439
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
08: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$1,015
Cost:
$548
$310 7,751 $705 38 - - - - $310
7,751
kWh
$705
38
kW-months/year
-
-
$
-
-
MMBtu
09: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$913
Cost:
-
$649 16,236 - - - - $264 67 $649
16,236
kWh
-
-
kW-months/year
-
-
$
$264
67
MMBtu
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,469
Cost:
$300
- - - - - - $1,469 374 -
-
kWh
-
-
kW-months/year
-
-
$
$1,469
374
MMBtu
TOTAL RECOMMENDED Savings:
$243,187
Cost:
$302,561
$201,163 5,029,070 $19,520 1,051 $20,771 - $1,733 441 $201,163
5,029,070
kWh
$19,520
1,051
kW-months/year
$20,771
-
$
$1,733
441
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas