IAC logo
IAC Assessment: OK1006
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1006
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2019
Principal Product purified water
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 5
Plant Area (Sq.Ft.) 35,000
Annual Production 5,079,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $68,511 1,671,000 kWh $0.04
Electricity Demand $77,314 3,975 kW-months/year $19.45
Electricity Fees $5,891 - $ -
Natural Gas $10,159 2,099 MMBtu $4.84
TOTAL ENERGY COSTS $161,875
RECOMMENDED SAVINGS* $10,632 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,661
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,856
Cost:
$17,056
- - - - $3,856 - - - -
-
kWh
-
-
kW-months/year
$3,856
-
$
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,072
Cost:
$9,350
$2,847 69,440 $1,225 63 - - - - $2,847
69,440
kWh
$1,225
63
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,709
Cost:
$2,600
$1,709 41,671 - - - - - - $1,709
41,671
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$262
Cost:
$1,320
$262 6,385 - - - - - - $262
6,385
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$392
Cost:
$155
$120 2,923 $272 14 - - - - $120
2,923
kWh
$272
14
kW-months/year
-
-
$
-
-
MMBtu
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$341
Cost:
-
$249 6,075 - - - - $92 19 $249
6,075
kWh
-
-
kW-months/year
-
-
$
$92
19
MMBtu
TOTAL RECOMMENDED Savings:
$10,632
Cost:
$30,481
$5,187 126,494 $1,497 77 $3,856 - $92 19 $5,187
126,494
kWh
$1,497
77
kW-months/year
$3,856
-
$
$92
19
MMBtu
TOTAL IMPLEMENTED Savings:
$8,661
Cost:
$26,561
$3,216 78,438 $1,497 77 $3,856 - $92 19 $3,216
78,438
kWh
$1,497
77
kW-months/year
$3,856
-
$
$92
19
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas