IAC logo
IAC Assessment: OK1008
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1008
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2019
Principal Product Ice coolers, propane lanterns
NAICS 339920 - Sporting and Athletic Goods Manufacturing
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 1,000
Plant Area (Sq.Ft.) 1,300,000
Annual Production 1,200,000 Units
Production Hrs. Annual 8,760
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,184,192 54,604,800 kWh $0.04
Electricity Demand $1,841,514 99,273 kW-months/year $18.55
Electricity Fees $148,734 - $ -
Natural Gas $507,683 114,086 MMBtu $4.45
TOTAL ENERGY COSTS $4,682,123
RECOMMENDED SAVINGS* $285,782 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $148,049
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$108,355
Cost:
$105,560
$108,355 2,708,880 - - - - $108,355
2,708,880
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,601
Cost:
$16,747
$5,601 140,025 - - - - $5,601
140,025
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$107,652
Cost:
$264,795
$72,926 1,822,965 $34,726 1,872 - - $72,926
1,822,965
kWh
$34,726
1,872
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$29,328
Cost:
$2,128
$29,328 733,212 - - - - $29,328
733,212
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$19,941
Cost:
$2,337
$12,195 304,848 $7,746 418 - - $12,195
304,848
kWh
$7,746
418
kW-months/year
-
-
MMBtu
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$11,069
Cost:
-
$10,233 255,818 - - $836 188 $10,233
255,818
kWh
-
-
kW-months/year
$836
188
MMBtu
07: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$2,690
Cost:
-
$2,690 67,243 - - - - $2,690
67,243
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$1,146
Cost:
$1,788
- - - - $1,146 257 -
-
kWh
-
-
kW-months/year
$1,146
257
MMBtu
TOTAL RECOMMENDED Savings:
$285,782
Cost:
$393,355
$241,328 6,032,991 $42,472 2,290 $1,982 445 $241,328
6,032,991
kWh
$42,472
2,290
kW-months/year
$1,982
445
MMBtu
TOTAL IMPLEMENTED Savings:
$148,049
Cost:
$266,923
$112,487 2,811,995 $34,726 1,872 $836 188 $112,487
2,811,995
kWh
$34,726
1,872
kW-months/year
$836
188
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas