IAC logo
IAC Assessment: OK1010
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1010
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2019
Principal Product Pipeline Equipment
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $50,000,000-$100,000,000
# of Employees 160
Plant Area (Sq.Ft.) 124,636
Annual Production 30,000 Units
Production Hrs. Annual 3,120
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,167 2,547,900 kWh $0.04
Electricity Demand $112,548 8,654 kW-months/year $13.01
Natural Gas $67,794 15,963 MMBtu $4.25
TOTAL ENERGY COSTS $296,629
RECOMMENDED SAVINGS* $30,222 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,260
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,905
Cost:
$12,400
- - - - $4,905 - - - -
-
kWh
-
-
kW-months/year
$4,905
-
$
-
-
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,438
Cost:
$1,936
- - - - - - $7,438 1,750 -
-
kWh
-
-
kW-months/year
-
-
$
$7,438
1,750
MMBtu
03: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$1,032
Cost:
$947
$407 9,930 $625 48 - - - - $407
9,930
kWh
$625
48
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$885
Cost:
$1,760
$885 21,592 - - - - - - $885
21,592
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,024
Cost:
$3,948
- - - - - - $1,024 241 -
-
kWh
-
-
kW-months/year
-
-
$
$1,024
241
MMBtu
06: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$11,922
Cost:
$53,750
$2,295 55,986 - - - - $9,627 2,265 $2,295
55,986
kWh
-
-
kW-months/year
-
-
$
$9,627
2,265
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,016
Cost:
$11,730
$3,016 73,554 - - - - - - $3,016
73,554
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$30,222
Cost:
$86,471
$6,603 161,062 $625 48 $4,905 - $18,089 4,256 $6,603
161,062
kWh
$625
48
kW-months/year
$4,905
-
$
$18,089
4,256
MMBtu
TOTAL IMPLEMENTED Savings:
$14,260
Cost:
$17,043
$1,292 31,522 $625 48 $4,905 - $7,438 1,750 $1,292
31,522
kWh
$625
48
kW-months/year
$4,905
-
$
$7,438
1,750
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas