Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2019 |
Principal Product | Flooring |
NAICS | 326199 - All Other Plastics Product Manufacturing |
SIC | 3996 - Hard Surface Floor Coverings, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 28,171 Tons |
Production Hrs. Annual | 4,160 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $804,368 | 15,849,600 | kWh | $0.05 |
Electricity Demand | $545,443 | 47,333 | kW-months/year | $11.52 |
Electricity Fees | $19,925 | - | $ | - |
Natural Gas | $410,380 | 144,500 | MMBtu | $2.84 |
LPG | $5,529 | 322 | MMBtu | $17.17 |
Other Gas | $20,047 | 1 | MMBtu | $20,047.00 |
TOTAL ENERGY COSTS | $1,810,172 | |||
RECOMMENDED SAVINGS* | $99,182 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $56,240 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $7,499 Cost: $1,898 |
$7,499 | 147,040 | - | - | - | - | - | - |
$7,499 147,040 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $5,528 Cost: $8,106 |
$5,528 | 108,385 | - | - | - | - | - | - |
$5,528 108,385 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,937 Cost: $15,573 |
$3,937 | 77,203 | - | - | - | - | - | - |
$3,937 77,203 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $43,176 Cost: $71,250 |
$30,112 | 590,436 | $13,064 | 1,134 | - | - | - | - |
$30,112 590,436 kWh |
$13,064 1,134 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $13,080 Cost: $57,161 |
- | - | - | - | $13,080 | - | - | - |
- - kWh |
- - kW-months/year |
$13,080 - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $5,110 Cost: $63 |
- | - | - | - | - | - | $5,110 | 1,799 |
- - kWh |
- - kW-months/year |
- - $ |
$5,110 1,799 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6232 INSTALL SET-BACK TIMERS |
Savings: $480 Cost: $240 |
$443 | 8,687 | - | - | - | - | $37 | 13 |
$443 8,687 kWh |
- - kW-months/year |
- - $ |
$37 13 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1223 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) |
Savings: $18,744 Cost: $35,736 |
- | - | - | - | - | - | $18,744 | 6,600 |
- - kWh |
- - kW-months/year |
- - $ |
$18,744 6,600 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION |
Savings: $1,628 Cost: - |
$594 | 11,646 | $1,034 | 90 | - | - | - | - |
$594 11,646 kWh |
$1,034 90 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $99,182 Cost: $190,027 |
$48,113 | 943,397 | $14,098 | 1,224 | $13,080 | - | $23,891 | 8,412 | $48,113 943,397 kWh |
$14,098 1,224 kW-months/year |
$13,080 - $ |
$23,891 8,412 MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $56,240 Cost: $88,721 |
$42,142 | 826,325 | $14,098 | 1,224 | - | - | - | - | $42,142 826,325 kWh |
$14,098 1,224 kW-months/year |
- - $ |
- - MMBtu |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas |