IAC logo
IAC Assessment: OK1015
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1015
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2019
Principal Product Inorganic Chemicals
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 48
Plant Area (Sq.Ft.) 1,740,000
Annual Production 992 Tons
Production Hrs. Annual 8,760
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,807,078 85,976,924 kWh $0.03
Electricity Demand $1,036,546 135,969 kW-months/year $7.62
Other Gas $196,459 17,797 MMBtu $11.04
TOTAL ENERGY COSTS $4,040,083
RECOMMENDED SAVINGS* $33,087 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $747
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Gas Electricity Usage Electricity Demand Other Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$16,383
Cost:
$12,752
- - - - $16,383 1,484 -
-
kWh
-
-
kW-months/year
$16,383
1,484
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,577
Cost:
$17,500
- - - - $15,577 1,411 -
-
kWh
-
-
kW-months/year
$15,577
1,411
MMBtu
03: 2.6232 INSTALL SET-BACK TIMERS Savings:
$320
Cost:
$200
$320 9,682 - - - - $320
9,682
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$380
Cost:
$435
$288 8,736 $92 12 - - $288
8,736
kWh
$92
12
kW-months/year
-
-
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$427
Cost:
$2,045
$206 6,261 $221 29 - - $206
6,261
kWh
$221
29
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$33,087
Cost:
$32,932
$814 24,679 $313 41 $31,960 2,895 $814
24,679
kWh
$313
41
kW-months/year
$31,960
2,895
MMBtu
TOTAL IMPLEMENTED Savings:
$747
Cost:
$2,245
$526 15,943 $221 29 - - $526
15,943
kWh
$221
29
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Other Gas Electricity Usage Electricity Demand Other Gas