IAC Assessment: OK1018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2019
Principal Product Hand trucks
NAICS 333922 - Conveyor and Conveying Equipment Manufacturing
SIC 3535 - Conveyors And Conveying Equipment
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 239,000
Annual Production 1,300,000 Units
Production Hrs. Annual 3,432
Location (State) KS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $89,786 2,273,399 kWh $0.04
Electricity Demand $213,706 10,978 kW-months/year $19.47
Electricity Fees $17,939 - $ -
Natural Gas $72,950 16,533 MMBtu $4.41
TOTAL ENERGY COSTS $394,381
RECOMMENDED SAVINGS* $92,985 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$44,286
Cost:
$21,990
- - - - $44,286 - -
-
kWh
-
-
kW-months/year
$44,286
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$37,691
Cost:
$60,951
$16,819 425,800 $20,872 1,072 - - $16,819
425,800
kWh
$20,872
1,072
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,409
Cost:
$4,914
$2,409 60,988 - - - - $2,409
60,988
kWh
-
-
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,577
Cost:
-
$1,577 39,914 - - - - $1,577
39,914
kWh
-
-
kW-months/year
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,422
Cost:
$870
$889 22,514 $1,533 79 - - $889
22,514
kWh
$1,533
79
kW-months/year
-
-
$
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$547
Cost:
-
$547 13,836 - - - - $547
13,836
kWh
-
-
kW-months/year
-
-
$
07: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$507
Cost:
$219
$155 3,924 $352 18 - - $155
3,924
kWh
$352
18
kW-months/year
-
-
$
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$3,546
Cost:
-
$3,546 89,762 - - - - $3,546
89,762
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$92,985
Cost:
$88,944
$25,942 656,738 $22,757 1,169 $44,286 - $25,942
656,738
kWh
$22,757
1,169
kW-months/year
$44,286
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees