Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Oklahoma State University |
---|---|
Assessment Year | 2019 |
Principal Product | Animal Feed |
NAICS | 311119 - Other Animal Food Manufacturing |
SIC | 2048 - Prepared Feeds, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 47 |
Plant Area (Sq.Ft.) | 126,216 |
Annual Production | 175,000 Tons |
Production Hrs. Annual | 4,784 |
Location (State) | OK |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $352,935 | 5,927,200 | kWh | $0.06 |
Electricity Demand | $167,842 | 24,235 | kW-months/year | $6.93 |
Electricity Fees | $5,445 | - | $ | - |
Natural Gas | $95,552 | 28,111 | MMBtu | $3.40 |
TOTAL ENERGY COSTS | $631,091 | |||
RECOMMENDED SAVINGS* | $17,547 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $11,882 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS |
Savings: $957 Cost: $524 |
$624 | 10,400 | $333 | 48 | - | - | - | - |
$624 10,400 kWh |
$333 48 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,490 Cost: $4,312 |
$1,776 | 29,598 | $714 | 103 | - | - | - | - |
$1,776 29,598 kWh |
$714 103 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,570 Cost: $850 |
$1,570 | 26,172 | - | - | - | - | - | - |
$1,570 26,172 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $6,865 Cost: $426 |
- | - | - | - | $6,865 | 2,019 | - | - |
- - kWh |
- - kW-months/year |
$6,865 2,019 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8117 INSTALL SUB-METERING EQUIPMENT |
Savings: $5,665 Cost: $887 |
- | - | - | - | - | - | $5,665 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,665 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,547 Cost: $6,999 |
$3,970 | 66,170 | $1,047 | 151 | $6,865 | 2,019 | $5,665 | - | $3,970 66,170 kWh |
$1,047 151 kW-months/year |
$6,865 2,019 MMBtu |
$5,665 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $11,882 Cost: $6,112 |
$3,970 | 66,170 | $1,047 | 151 | $6,865 | 2,019 | - | - | $3,970 66,170 kWh |
$1,047 151 kW-months/year |
$6,865 2,019 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |