IAC logo
IAC Assessment: OK1021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2019
Principal Product Animal Feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $10,000,000-$50,000,000
# of Employees 47
Plant Area (Sq.Ft.) 126,216
Annual Production 175,000 Tons
Production Hrs. Annual 4,784
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $352,935 5,927,200 kWh $0.06
Electricity Demand $167,842 24,235 kW-months/year $6.93
Electricity Fees $5,445 - $ -
Natural Gas $95,552 28,111 MMBtu $3.40
TOTAL ENERGY COSTS $631,091
RECOMMENDED SAVINGS* $17,547 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,882
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7211 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS Savings:
$957
Cost:
$524
$624 10,400 $333 48 - - - - $624
10,400
kWh
$333
48
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,490
Cost:
$4,312
$1,776 29,598 $714 103 - - - - $1,776
29,598
kWh
$714
103
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,570
Cost:
$850
$1,570 26,172 - - - - - - $1,570
26,172
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$6,865
Cost:
$426
- - - - $6,865 2,019 - - -
-
kWh
-
-
kW-months/year
$6,865
2,019
MMBtu
-
-
$
05: 2.8117 INSTALL SUB-METERING EQUIPMENT Savings:
$5,665
Cost:
$887
- - - - - - $5,665 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,665
-
$
TOTAL RECOMMENDED Savings:
$17,547
Cost:
$6,999
$3,970 66,170 $1,047 151 $6,865 2,019 $5,665 - $3,970
66,170
kWh
$1,047
151
kW-months/year
$6,865
2,019
MMBtu
$5,665
-
$
TOTAL IMPLEMENTED Savings:
$11,882
Cost:
$6,112
$3,970 66,170 $1,047 151 $6,865 2,019 - - $3,970
66,170
kWh
$1,047
151
kW-months/year
$6,865
2,019
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $