IAC Assessment: OK1028
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK1028
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 2020
Principal Product carbonated beverages
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $50,000,000-$100,000,000
# of Employees 100
Plant Area (Sq.Ft.) 152,000
Annual Production 48,000 Thousand Gallons
Production Hrs. Annual 7,488
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $556,784 11,248,191 kWh $0.05
Electricity Demand $151,971 27,400 kW-months/year $5.55
Natural Gas $89,196 24,132 MMBtu $3.70
TOTAL ENERGY COSTS $797,951
RECOMMENDED SAVINGS* $13,025 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$5,729
Cost:
$1,500
- - - - $5,729 1,549 -
-
kWh
-
-
kW-months/year
$5,729
1,549
MMBtu
02: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$2,193
Cost:
$3,750
- - - - $2,193 593 -
-
kWh
-
-
kW-months/year
$2,193
593
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,990
Cost:
$3,313
$1,704 34,784 $286 52 - - $1,704
34,784
kWh
$286
52
kW-months/year
-
-
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$53
Cost:
$111
$53 1,074 - - - - $53
1,074
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,802
Cost:
$8,260
$2,802 57,188 - - - - $2,802
57,188
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$258
Cost:
$616
$258 5,263 - - - - $258
5,263
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,025
Cost:
$17,550
$4,817 98,309 $286 52 $7,922 2,142 $4,817
98,309
kWh
$286
52
kW-months/year
$7,922
2,142
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas